Capital Project Tracker

Rendering of Lakeside Center

In order to invest in the care of our parks, we must regularly redesign and rebuild our city’s parks and facilities. There are several hundred active projects taking place at any time in parks throughout the city, ranging from improvements to parks, playgrounds, and greenways, to renovations of ball fields and recreational facilities, to resiliency efforts for beaches and boardwalks. Learn more about projects taking place near you, and find out the current status of a project.

How We Build Parks

Visit our How We Build Parks page to learn more about the three main phases of the city’s capital process and how a project becomes eligible for capital funding.

View Active ProjectsView Proposed ProjectsView Partner ProjectsView Completed Projects

Completed Projects (1,276) View only projects nearing completion

Bronx Projects

Location Project Phase Completion Date
Abigail Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Agnes Haywood Playground Agnes Haywood Playground Reconstruction Completed March 2019
Al Quiñones Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction Completed October 2018
Al Quiñones Playground Kelly Playground Skate Park Reconstruction Completed July 2018
Al Quiñones Playground Playground 52 Reconstruction Completed March 2018
Allerton Playground Bronx General Site Work (XG-114M) Completed March 2017
Allerton Playground Bronx General Site Work (XG-514M) Completed February 2017
Aqueduct Walk Aqueduct Walk 182nd Place Pathway Reconstruction Completed June 2014
Aqueduct Walk Aqueduct Walk 182nd Street Public Restroom Building Construction Completed August 2019
Aqueduct Walk Aqueduct Walk Plaza Reconstruction Completed October 2019
Aqueduct Walk Morton Playground Reconstruction Completed May 2022
Aqueduct Walk Old Croton Aqueduct Signage Installation Completed April 2017
Arcilla Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bailey Playground Bailey Playground Public Restroom Building Roof Reconstruction Completed January 2024
Bicentennial Veterans Memorial Park Bronx General Site Work (XG-315M) Completed December 2017
Bridge Playground Bridge Playground Reconstruction Completed April 2022
Bronx Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Bronx Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bronx Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Bronx Park Bronx Park Adult Fitness Equipment Construction Completed July 2019
Bronx Park Bronx Park Anadromous Fish Passage Reconstruction Completed December 2014
Bronx Park Bronx Park Brady Playground Adult Fitness Equipment Construction Completed January 2017
Bronx Park Bronx Park Dog Run Construction Completed June 2019
Bronx Park Bronx Park French Charley's Playground Public Restroom Building Roof Reconstruction Completed October 2023
Bronx Park Bronx Park Skate Park Drinking Fountain Construction Completed November 2023
Bronx Park Bronx River Park Greenway Construction Completed June 2017
Bronx Park Ranaqua Roof Reconstruction Completed February 2024
Bronx Park Waring Playground Reconstruction Completed March 2022
Bronx River Parkway Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Bronx River Parkway Bronx River (Shoelace) Park Link Reconstruction Completed April 2021
Bronx River Parkway Bronx River Park 233rd Street Bikeway Reconstruction Completed May 2019
Bronx River Parkway Bronx River Parkway Paths Reconstruction Completed November 2022
Bronx River Parkway Parque de los Ninos Playground and Seating Area Reconstruction Completed March 2017
Bronx River Parkway Parque de los Ninos Softball Field and Running Track Construction Completed July 2019
Bronx River Parkway Shoelace Park Green Infrastructure Construction Phase 1 Completed July 2018
Bruckner Boulevard and Westchester Avenue Amendola Plaza Reconstruction Completed April 2017
Bufano Park Bronx General Site Work (XG-315M) Completed December 2017
CS 134 Community Improvement Garden CS 134 Community Garden Reconstruction Completed June 2023
Captain William Harry Thompson Playground Playground 174 Public Restroom Building Reconstruction Completed April 2022
Captain William Harry Thompson Playground Playground 174 Reconstruction Completed January 2020
Caserta Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Castle Hill Little League Field Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Castle Hill Park Castle Hill Park Paths Construction Completed January 2016
Cedar Playground Cedar Playground Basketball Court and Playground Reconstruction Completed August 2016
Cedar Playground Cedar Playground Public Restroom Building Reconstruction Completed October 2020
City Island Avenue and Belden Street Belden Point Reconstruction Completed December 2015
Claremont Park Bronx General Site Work (XG-114M) Completed March 2017
Claremont Park Claremont Park Pavement Reconstruction Completed November 2020
Claremont Park Claremont Park Retaining Wall Reconstruction Completed September 2023
Co-op City Field Co-Op City Field Bleacher and Pathway Reconstruction Completed August 2014
Co-op City Field Co-Op City Field Irrigation System Installation Completed December 2020
Colucci Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Colucci Playground Colucci Playground Adult Fitness Equipment Construction Completed August 2020
Colucci Playground Colucci Playground Seating Area Reconstruction Completed August 2017
Concrete Plant Park Concrete Plant Park Emergency Tower Demolition Completed August 2023
Cooney Grauer Field Cooney Grauer Field Lighting Reconstruction Completed February 2024
Cpl Fischer Park Corporal Irwin Fischer Park Construction Completed February 2023
Crotona Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Crotona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Crotona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Crotona Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Crotona Park Citywide Pool Piping Hangers and Supports Reconstruction (CNYG-419M) Completed January 2021
Crotona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Crotona Park Bronx General Site Work (XG-410M) Completed September 2013
Crotona Park Crotona Par Public Restroom Building Reconstruction Completed June 2021
Crotona Park Crotona Park Ballfield 1 Lighting Installation Completed July 2020
Crotona Park Crotona Park Ballfield 5 Synthetic Turf Field Construction Completed December 2022
Crotona Park Crotona Park Bathhouse Entrance Reconstruction Completed March 2021
Crotona Park Crotona Park Nature Center Reconstruction Completed August 2021
Crotona Park Crotona Park Tennis Building Electrical Upgrade Completed December 2014
Crotona Park Crotona Pool Wall and Fence Reconstruction Completed August 2019
Crotona Parkway Malls Crotona Parkway Green Infrastructure Construction Completed June 2015
Crotona Parkway Malls Crotona Parkway Malls Reconstruction Completed November 2022
DOT (Non-Parks) Property in the Bronx Bronx River Greenway Construction Completed August 2014
Davidson Park Davidson Park Construction Completed January 2024
Devoe Park Devoe Park Dog Run Construction Completed November 2021
Devoe Park Devoe Park Maintenance Shed Roof Reconstruction Completed December 2021
Devoe Park Devoe Park Perimeter Steel Gates Installation Completed December 2018
Drew Playground Drew Playground Park Security Lighting Construction Completed December 2021
Dunbar Playground Bronx General Site Work (XG-114M) Completed March 2017
Eastchester Playground Bronx General Site Work (XG-514M) Completed February 2017
Eastchester Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Estella Diggs Park Estella Diggs Park Reconstruction Completed May 2017
Evelina Antonetty Playground Garrison Playground Reconstruction Completed January 2020
Ewen Park Ewen Park Adult Fitness Equipment Construction Completed June 2023
Ewen Park Ewen Park Tot Lot Construction and Basketball Court Reconstruction Completed December 2016
FDNY-EMT Yadira Arroyo Playground Black Rock Playground Reconstruction Completed April 2019
Ferry Point Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Ferry Point Park Ferry Point Community Park Public Restroom Building Construction Completed July 2015
Ferry Point Park Ferry Point Park Golf Course Construction Completed June 2014
Ferry Point Park Ferry Point Park Golf Course Parking Lot Reconstruction Completed May 2015
Ferry Point Park Ferry Point Park Passive Waterfront Path and Landscape Construction Completed March 2021
Ferry Point Park Ferry Point Park Synthetic Turf Soccer Field 1 Reconstruction (Hurricane Sandy) Completed January 2017
Ferry Point Park Ferry Point Park West Public Restroom Building Construction Completed March 2018
Ferry Point Park Ferry Point Park West Public Restroom Building Construction - Electrical Completed March 2018
Ferry Point Park Ferry Point Park West Public Restroom Building Construction - HVAC Completed March 2018
Ferry Point Park Ferry Point Park West Public Restroom Building Construction - Plumbing Completed March 2018
Fox Park Fox Playground Public Restroom Building Construction Completed December 2022
Franz Sigel Park Franz Sigel Park Ballfields and Basketball Court Reconstruction Completed May 2024
Gouverneur Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Grand Playground Grand Playground Construction Completed June 2017
Grant Park Grant Park Playground and Basketball Court Reconstruction Completed March 2020
Grove Hill Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Grove Hill Playground Grove Hill Playground Public Restroom Building Reconstruction Completed April 2023
Haffen Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Haffen Park Bronx General Site Work (XG-410M) Completed September 2013
Harris Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Harris Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Harris Park Harris Park Reconstruction Completed February 2018
Havemeyer Playground Havemeyer Playground Public Restroom Building Reconstruction Completed January 2024
Henry Hudson Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Henry Hudson Park Henry Hudson Park Basketball and Handball Courts Reconstruction Completed September 2019
Highbridge Park Old Croton Aqueduct Signage Installation Completed April 2017
Highbridge Park Highbridge Park Step Street Reconstruction Completed October 2021
Hilton White Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Hugh J. Grant Circle Hugh Grant Circle and Virginia Park Reconstruction Completed May 2021
Hunts Point Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction Completed October 2018
Hunts Point Playground Hunts Point Playground Reconstruction Completed May 2019
Hutchinson River Parkway Hutchinson River Greenway Construction Completed October 2013
Hutchinson River Parkway Kissena Corridor Park and Hutchinson River Parkway Path Lighting Construction Completed April 2023
I-Am-Park Bronx General Site Work (XG-114M) Completed March 2017
Jackson Forest Garden Jackson Forest Community Garden Reconstruction Completed April 2017
Jerome Park Old Croton Aqueduct Signage Installation Completed April 2017
Jerome Park Jerome Park Reservoir Jogging Trail Construction Completed December 2014
Jerome Playground South Jerome Playground South Skate Park Construction Completed September 2023
Joyce Kilmer Park Joyce Kilmer Park Perimeter Fence Construction Completed March 2018
Julio Carballo Fields Hunts Point Recreation Center Gymnasium Floor and Stage Reconstruction Completed December 2023
Julio Carballo Fields Julio Carballo Fields Lighting and Scoreboard Construction Completed April 2023
Kingsbridge Heights Community Center Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Kwame Ture Recreation Center Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Kwame Ture Recreation Center West Bronx Recreation Center AC Reconstruction Completed January 2020
La Finca del Sur Community Garden Bronx General Site Work (XG-514M) Completed February 2017
Little Claremont Playground Little Claremont Playground Reconstruction Completed December 2018
Longfellow Playground Longfellow Gardens Reconstruction Completed September 2018
Loreto Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Loreto Playground Loreto Playground Asphalt Multi-Purpose Play Area Construction Completed August 2022
Lozada Playground Bronx General Site Work (XG-514M) Completed February 2017
Lozada Playground Lozada Playground Public Restroom Building Roof Reconstruction Completed March 2024
Lyons Square Playground Luther Gulick and Yolanda Garcia Park, Lyons Square, Saw Mill, and Ten Eyck Playgrounds Public Restroom Building Construction Completed October 2020
Lyons Square Playground Lyons Square Playground Reconstruction Completed December 2017
Macombs Dam Park Bronx General Site Work (XG-415M) Completed December 2018
Mapes Park Mapes Ballfield Reconstruction Completed April 2021
Mapes Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Mapes Pool Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Mapes Pool Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Mazzei Playground Bronx General Site Work (XG-514M) Completed February 2017
Melrose Commons Park Melrose Commons Site 62 Park Construction Completed September 2022
Merriam Playground Bronx General Site Work (XG-410M) Completed September 2013
Mill Pond Park Bronx Children's Museum Roof Reconstruction Completed May 2023
Millbrook Playground Millbrook Playground Basketball and Handball Court Reconstruction Completed June 2018
Morgan Playground Bronx General Site Work (XG-410M) Completed September 2013
Mosholu Parkway Bronx General Site Work (XG-114M) Completed March 2017
Mosholu Parkway Bensonhurst Senior Recreation Center and Mosholu Parkway Public Restroom Building Boiler and Heating System Reconstruction Completed July 2023
Mosholu Parkway Kossuth Playground Reconstruction Completed October 2020
Mosholu Parkway Mosholu Parkway WWI Monument Lighting System Construction Completed September 2013
Mott Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Mount Hope Garden Mt. Hope Garden Play Area Reconstruction Completed December 2018
Nelson Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Nelson Playground Nelson Playground Basketball Court and Bleachers Reconstruction Completed December 2018
Noble Playground Noble Playground Public Restroom Building Reconstruction Completed May 2022
Noble Playground Noble Playground Reconstruction Completed May 2023
Ogden Plimpton Playground Ogden Plimpton Playground Reconstruction Completed December 2018
Owen F. Dolen Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Owen F. Dolen Park Owen Dolen Recreation Center Roof Reconstruction Completed August 2020
P.O. Serrano Playground PO Serrano Playground Synthetic Turf Field Reconstruction Completed August 2023
Parkside Playground Parkside Playground Green Infrastructure Construction Completed July 2024
Patterson Playground Patterson Playground Entry Pavement Reconstruction Completed March 2022
Patterson Playground Patterson Playground Reconstruction Completed July 2020
Pelham Bay Park Bronx General Site Work (XG-315M) Completed December 2017
Pelham Bay Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Pelham Bay Park Bronx General Site Work (XG-415M) Completed December 2018
Pelham Bay Park Orchard Beach Nature Center Reconstruction Completed May 2024
Pelham Bay Park Orchard Beach Nature Center Roof Reconstruction Completed July 2018
Pelham Bay Park Orchard Beach Pavilion Fencing, Netting, and Scaffolding Emergency Installation Completed September 2013
Pelham Bay Park Pelham Bay Park Adult Fitness Equipment and Nature Walk Construction Completed August 2017
Pelham Bay Park Pelham Bay Park Ballfield Lighting Reconstruction Completed February 2024
Pelham Bay Park Pelham Bay Park Ballfields 4 & 5 Lighting Reconstruction Completed May 2017
Pelham Bay Park Pelham Bay Park Guiderail Installation Completed December 2016
Pelham Bay Park Pelham Bay Park Natural Shoreline Reconstruction Completed September 2020
Pelham Bay Park Pelham Bay Park Sensory Garden Construction Completed July 2020
Pelham Bay Park Pelham Bay Park Service Building Gas Line Construction and Heating System Reconstruction Completed March 2019
Pelham Bay Park Pelham Bay Park Synthetic Turf and Track Reconstruction Completed September 2024
Pelham Bay Park Pelham Bay Park Waterfront Reconstruction Completed September 2015
Pelham Parkway Pelham Parkway Malls Reconstruction Completed November 2017
People's Park Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
People's Park Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
People's Park Citywide Public Restroom Building and Facility Reconstruction (CNYG-814MA) Completed May 2019
Playground One Thirty Four CXXXIV Playground 134 Reconstruction Completed June 2021
Plimpton Playground Plimpton Playground Reconstruction Completed November 2019
Prospect Playground Prospect Playground Reconstruction Completed December 2021
Pugsley Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Pugsley Creek Park Pugsley Creek Park Basketball Court Construction Completed June 2016
Pulaski Park Pulaski Park Sport Courts Reconstruction and Tot Lot Construction Completed July 2021
Rainbow Garden 159th Street Community Garden Water Service Installation Completed September 2024
Ranaqua Playground Ranaqua Park Reconstruction Completed December 2017
Randall Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rev J Polite Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Rev J Polite Playground Rev. J. Polite Playground Synthetic Turf Field Reconstruction Completed August 2022
Rev. T. Wendell Foster Park and Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Rev. T. Wendell Foster Park and Recreation Center Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Rev. T. Wendell Foster Park and Recreation Center Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Rev. T. Wendell Foster Park and Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Rev. T. Wendell Foster Park and Recreation Center Mullaly Park Telecommunication Lines Reconstruction Completed September 2022
Rev. T. Wendell Foster Park and Recreation Center Mullaly Recreation Center Door Replacement Completed March 2018
Richman (Echo) Park Echo Park Playground and Basketball Courts Reconstruction Completed May 2021
Richman (Echo) Park Richman (Echo) Park Maintenance Shed Roof Reconstruction Completed February 2022
Riverbend Playground Bronx General Site Work (XG-415M) Completed December 2018
Saw Mill Playground Luther Gulick and Yolanda Garcia Park, Lyons Square, Saw Mill, and Ten Eyck Playgrounds Public Restroom Building Construction Completed October 2020
Seabury Playground Seabury Playground Reconstruction Completed September 2017
Seton Falls Park Seton Falls Park Sidewalk and Fence Reconstruction Completed December 2022
Seton Park Seton Park Ballfields Reconstruction Completed October 2019
Soundview Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Soundview Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Soundview Park Bronx River Greenway Construction Completed August 2014
Soundview Park Soundview Park Dog Run Construction Completed June 2016
Soundview Park Soundview Park Performance Lawn and Overlook Construction Completed April 2015
Soundview Park Soundview Park Playground and Sports Courts Reconstruction Completed May 2017
Soundview Park Soundview Park Public Restroom Building Construction Completed December 2016
Soundview Park Soundview Park Running Track and Athletic Field Construction Completed June 2014
Spuyten Duyvil Playground Spuyten Duyvil Playground Spray Shower Reconstruction Completed October 2019
St. James Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
St. James Park Bronx General Site Work (XG-114M) Completed March 2017
St. James Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
St. James Park Bronx General Site Work (XG-415M) Completed December 2018
St. James Park St. James Park Dog Run Construction Completed June 2023
St. James Park St. James Recreation Center HVAC and Boiler Emergency Reconstruction (Hurricane Ida) Completed January 2024
St. James Park St. James Recreation Center HVAC Reconstruction Completed January 2020
St. Mary's Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. Mary's Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
St. Mary's Park St. Mary's Park and Recreation Center Green Infrastructure Construction Completed October 2019
St. Mary's Park St. Mary's Park Ballfields and Dog Run Reconstruction Completed June 2020
St. Mary's Park St. Mary's Park Playground West Public Restroom Building Reconstruction Completed May 2022
St. Mary's Park St. Mary's Park Playground West Reconstruction (X045-215MA) Completed August 2019
St. Mary's Park St. Mary's Park Plaza, Pathways, and Gil Scott-Heron Amphitheater Reconstruction Completed December 2022
St. Mary's Park St. Mary's Recreation Center Pool and Gymnasium HVAC Reconstruction Completed December 2018
Stebbins Playground Bronx General Site Work (XG-114M) Completed March 2017
Tiffany Street Pier Tiffany Street Pier Reconstruction (Hurricane Sandy) Completed April 2018
University Malls Old Croton Aqueduct Signage Installation Completed April 2017
University Woods University Park Stairway Reconstruction Completed June 2014
Van Cortlandt Park Old Croton Aqueduct Signage Installation Completed April 2017
Van Cortlandt Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Van Cortlandt Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Van Cortlandt Park Classic Playground Fitness Equipment Construction Completed June 2024
Van Cortlandt Park Van Cortlandt House Museum and Van Cortlandt Park Nature Center Telecommunication Lines Reconstruction Completed August 2022
Van Cortlandt Park Van Cortlandt Park Basketball Court Reconstruction Completed October 2021
Van Cortlandt Park Van Cortlandt Park Broadway Entrance Reconstruction Completed June 2020
Van Cortlandt Park Van Cortlandt Park Dog Run Construction Completed June 2018
Van Cortlandt Park Van Cortlandt Park Greenhouse Stabilization Completed June 2022
Van Cortlandt Park Van Cortlandt Park Indian Fields Ballfields Reconstruction Completed May 2022
Van Cortlandt Park Van Cortlandt Park Playground Construction Completed July 2020
Van Cortlandt Park Van Cortlandt Park Putnam Greenway Construction Completed October 2020
Van Cortlandt Park Van Cortlandt Park Shandler Recreation Area Paths Reconstruction Completed August 2023
Van Cortlandt Park Van Cortlandt Park Skate Park Construction Completed August 2020
Van Cortlandt Park Woodlawn Playground Spray Shower Reconstruction Completed September 2022
Van Nest Park Van Nest Flag Pole and Plaza Construction Completed February 2019
Van Nest Park Van Nest Playground Reconstruction Completed January 2015
Various Locations, Bronx Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-213M) Completed February 2014
Various locations in the Bronx Bronx Street Tree Planting FY13 - Community Boards 9-12 (XG-412M) Completed August 2013
Various locations in the Bronx Bronx Street Tree Planting FY14 - Community Boards 7-12 Completed January 2015
Various locations in the Bronx Bronx Street Tree Planting FY15 - Community Boards 1-8 Completed February 2016
Various locations in the Bronx Bronx Street Tree Planting FY15 - Community Boards 9-12 Completed April 2016
Various locations in the Bronx Bronx Street Tree Planting FY16 - Community Boards 1-8 Completed August 2017
Various locations in the Bronx Bronx Street Tree Planting FY16 - Community Boards 9-12 Completed August 2017
Various locations in the Bronx Bronx Street Tree Planting FY17 - Community Boards 1-8 Completed June 2018
Various locations in the Bronx Bronx Street Tree Planting FY17 - Community Boards 9-12 Completed June 2018
Various locations in the Bronx Bronx Street Tree Planting FY18 - Community Boards 1-8 Completed January 2021
Various locations in the Bronx Bronx Street Tree Planting FY19 - Community Boards 9-12 Completed June 2019
Various locations in the Bronx Bronx Street Tree Planting FY20 - Community Boards 9-12 Completed August 2021
Various locations in the Bronx Bronx Street Tree Planting FY21 Completed October 2021
Various locations in the Bronx Bronx Street Tree Planting FY21 - Community Boards 1-4 Completed July 2022
Various locations in the Bronx Bronx Street Tree Planting FY21 - Community Boards 1-4, 9, 10 Completed July 2023
Various locations in the Bronx Bronx Street Tree Planting FY21 - Community Boards 5-8 Completed August 2022
Various locations in the Bronx Bronx Street Tree Planting FY21 - Community Boards 9-12 Completed August 2022
Various locations in the Bronx. Bronx Street Tree Planting FY19 - Community Boards 1-8 Completed January 2019
Various locations, the Bronx Bronx Invasive Species Removal and Tree Planting FY14 Completed November 2016
Various locations, the Bronx Bronx Sandy-Related Tree Removal Completed July 2015
Various locations, the Bronx Bronx Sandy-Related Tree Replacement Completed March 2016
Various locations, the Bronx Bronx Street Tree Planting FY14 - Community Boards 1-6 Completed January 2015
Vidalia Park Bronx General Site Work (XG-315M) Completed December 2017
Vinmont Veteran Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Vinmont Veteran Park Bronx General Site Work (XG-315M) Completed December 2017
Virginia Park Hugh Grant Circle and Virginia Park Reconstruction Completed May 2021
Wakefield Playground Wakefield Playground Reconstruction Completed May 2022
Walter Gladwin Park Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Walter Gladwin Park Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
Walter Gladwin Park Citywide Public Restroom Building and Facility Reconstruction (CNYG-814MA) Completed May 2019
Walton Park Walton Park Reconstruction Completed February 2019
Washington's Walk Bronx General Site Work (XG-410M) Completed September 2013
Watson Avenue between Taylor Avenue and Thieriot Avenue NYCHA Sotomayor Houses Open Space Construction Completed August 2024
Watson Houses Playground NYCHA Watson Houses Open Space Construction Completed October 2023
West Farms Rapids West Farms Park Construction Completed April 2020
Whalen Playground Whalen Playground Reconstruction Completed June 2018
Williamsbridge Oval Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Williamsbridge Oval Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
Williamsbridge Oval Bronx and Manhattan Recreation and Nature Center HVAC Repair (CNYG-1810MA) Completed July 2015
Williamsbridge Oval Williamsbridge Oval Recreation Building Reconstruction Completed November 2013
Williamsbridge Oval Williamsbridge Oval Skate Park Construction Completed July 2019
Willis Playground Bronx General Site Work (XG-514M) Completed February 2017
Willis Playground Willis Playground Public Restroom Building Roof Reconstruction Completed October 2016
Willis Playground Willis Playground Reconstruction Completed October 2022
Wishing Well Garden Wishing Well Community Garden Water Service Installation Completed September 2024
Yolanda García Park Luther Gulick and Yolanda Garcia Park, Lyons Square, Saw Mill, and Ten Eyck Playgrounds Public Restroom Building Construction Completed October 2020
Yolanda García Park Yolanda Garcia Park Construction Completed April 2019
Zimmerman Playground Zimmerman Playground Public Restroom Building Roof Reconstruction Completed April 2017
Bronx Street Tree Planting FY13 - Community Boards 1-8 (XG-113M) Completed February 2014

Brooklyn Projects

Location Project Phase Completion Date
18th Avenue between 47th Street and 48th Street PS 192 Playground Reconstruction Completed June 2014
Albemarle Playground Albemarle Playground Synthetic Turf Field and Basketball Court Reconstruction Completed November 2022
American Veterans Memorial Pier Bay Ridge Eco-Dock Construction Completed September 2013
Asser Levy Park Asser Levy Park Adult Fitness Area Construction Completed February 2023
Asser Levy Park Asser Levy Park Flagpole Installation Completed September 2015
Asser Levy Park Asser Levy Park Playground & Path Reconstruction Completed December 2018
Babi Yar Triangle Playground Babi Yar Triangle Playground Reconstruction Completed May 2022
Banneker Playground Banneker Playground and Tilden Playground Public Restroom Building Reconstruction Completed January 2023
Banneker Playground Banneker Playground Public Restroom Building Roof Reconstruction Completed May 2018
Bartlett Playground Bartlett Playground Reconstruction Completed July 2022
Bath Beach Park Bath Beach Park Playground Reconstruction Completed February 2023
Bayview Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Bayview Playground Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
Bayview Playground Citywide Public Restroom Building and Facility Reconstruction (CNYG-814MA) Completed May 2019
Bayview Playground Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Beaver Noll Park Beaver Noll Park Construction Completed June 2019
Belt Parkway/Shore Parkway Belt Parkway Landscape Restoration and Tree Planting at Canarsie Completed June 2019
Belt Parkway/Shore Parkway Belt Parkway Landscape Restoration and Tree Planting at Gerritsen Inlet Completed December 2021
Belt Parkway/Shore Parkway Shore Parkway Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Belt Parkway/Shore Parkway Shore Road Bicycle Path Reconstruction Completed August 2020
Benson Playground Benson Playground Asphalt Field and Handball Court Reconstruction Completed May 2017
Bensonhurst Park Bensonhurst Park Playground Reconstruction Completed December 2020
Bensonhurst Park Brooklyn General Site Work (BG-711M) Completed June 2014
Bergen Beach Playground Bergen Beach Playground Reconstruction Completed October 2018
Berriman Playground Gateway Estates Phase 1 Playground and Public Restroom Building Construction Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Public Restroom Building Construction - Electrical Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Public Restroom Building Construction - HVAC Completed February 2019
Berriman Playground Gateway Estates Phase 1 Playground and Public Restroom Building Construction - Plumbing Completed February 2019
Betsy Head Park Betsy Head Park Multi-Purpose Play Area Reconstruction Completed June 2020
Betsy Head Park Betsy Head Park Pool Filter Plant Reconstruction Completed November 2022
Betsy Head Park Betsy Head Park Public Restroom Building & Utility Building Reconstruction Completed December 2021
Betsy Head Park Betsy Head Park Public Restroom Building Construction Completed May 2023
Betsy Head Park Betsy Head Park Synthetic Turf Field, Track, Sport Courts and Adult Fitness Area Construction Completed November 2020
Betsy Head Park Betsy Head Playground Reconstruction Completed December 2015
Betsy Head Park Betsy Head Pool Electrical System Reconstruction Completed April 2023
Betsy Head Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Betsy Head Park Citywide Olympic Pool Mechanical Systems Reconstruction Completed January 2024
Betsy Head Park Citywide Pool Electrical Systems Reconstruction (CNYG-614M) Completed October 2018
Betsy Head Park Citywide Pool Piping Hangers and Supports Reconstruction (CNYG-419M) Completed January 2021
Betsy Head Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Between Brighton 1st Street, Neptune Avenue, West End Avenue, and the Coney Island Boardwalk Coney Island Greenstreets and Green Infrastructure Construction Completed November 2020
Bildersee Playground Bildersee Playground Reconstruction Phase 1 Completed December 2019
Bill Brown Playground Bill Brown Playground Public Restroom Building Reconstruction Completed June 2019
Brighton Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Brizzi Playground Dyker Beach Park Paths and Brizzi Playground Reconstruction Completed November 2014
Brooklyn - Queens Connecting Highway Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Brower Park Brower Park Basketball Courts Reconstruction Completed November 2019
Brower Park Brower Park Pathway Reconstruction Completed November 2021
Brower Park Brower Park Skate Park Element Installation Completed July 2016
Brower Park Brower Park Telecommunication Lines Reconstruction Completed November 2022
Brownsville Playground Brooklyn and Queens Recreation and Nature Centers HVAC Systems Reconstruction (CNYG-1910MA1) Completed October 2018
Brownsville Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Brownsville Playground Brownsville Playground Ballfield Lighting Reconstruction Completed December 2023
Brownsville Playground Brownsville Recreation Center Pool HVAC System Reconstruction Completed March 2014
Brownsville Playground Brownsville Recreation Center Pool Roof Reconstruction Completed June 2017
Bushwick Inlet Park Bushwick Inlet Park (50 Kent Avenue) New Park Construction Completed December 2022
Bushwick Inlet Park Bushwick Inlet Park Synthetic Turf Field Reconstruction Completed July 2022
Bushwick Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Bushwick Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Bushwick Playground Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Bushwick Playground Bushwick Playground Pool Reconstruction Completed June 2017
Bushwick Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Butterfly Gardens Butterfly Gardens Pavement Reconstruction and Planted Area Expansion Completed September 2018
Cadman Plaza Park Brooklyn War Memorial Restroom and Eleanor Roosevelt Playground Public Restroom Building Reconstruction Completed April 2023
Cadman Plaza Park Cadman Plaza Park Brooklyn War Memorial ADA Ramp and Elevator Construction Completed October 2021
Cadman Plaza Park Cadman Plaza Park Oval Reconstruction Completed April 2024
Cadman Plaza Park Cadman Plaza Park Synthetic Turf Reconstruction Completed September 2023
Callahan-Kelly Playground Callahan-Kelly Playground Reconstruction Completed August 2023
Calvert Vaux Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Calvert Vaux Park Calvert Vaux Park Aquatic and Coastal Upland Habitat Restoration Completed August 2013
Calvert Vaux Park Calvert Vaux Park Ballfield Lighting Reconstruction Completed September 2023
Calvert Vaux Park Calvert Vaux Park Public Restroom Building and Maintenance Facility Construction Completed March 2023
Calvert Vaux Park Calvert Vaux Park Soccer Fields Construction Completed October 2013
Canarsie Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Canarsie Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Canarsie Park Canarsie Park Playground Construction Completed October 2013
Canarsie Park Canarsie Park Public Restroom Building Construction Completed October 2024
Canarsie Park Canarsie West Trail Connector Construction Completed May 2018
Captain John McKenna, IV Park Captain John McKenna IV Park Water Line Reconstruction Completed July 2021
Carroll Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Carver Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Charlie's Place Charlie's Place Reconstruction Completed November 2022
City Line Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
City Line Park City Line Park Synthetic Turf Field, Skate Park, and Basketball Court Construction Completed July 2019
Coffey Park Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Coffey Park Coffey Park Pathway and Barbecue Area Reconstruction Completed June 2015
Colonel David Marcus Playground Colonel David Marcus Playground Public Restroom Building Reconstruction Completed November 2019
Colonel David Marcus Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Colonel David Marcus Playground Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Columbus Park Columbus Park Pavement Reconstruction Completed November 2016
Commodore Barry Park Commodore Barry Park Pool Deck Reconstruction Completed June 2017
Commodore Barry Park Commodore Barry Park Public Restroom Building Reconstruction Completed October 2023
Coney Island Beach & Boardwalk Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Coney Island Beach & Boardwalk Abe Stark Skating Rink Boiler and Chiller Reconstruction Completed August 2014
Coney Island Beach & Boardwalk Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Coney Island Beach & Boardwalk Coney Island Beach and Boardwalk Entrance Gardens Construction Completed April 2015
Coney Island Beach & Boardwalk Coney Island Boardwalk Reconstruction, Brighton 15th Street to Coney Island Avenue Completed May 2016
Coney Island Beach & Boardwalk Coney Island Boardwalk Security Measures Construction Completed April 2024
Coney Island Beach & Boardwalk Coney Island Lifeguard Station Electrical Service Reconstruction Completed June 2021
Cooper Park Cooper Park Dog Run Construction and Athletic Courts Reconstruction Completed December 2015
Cooper Park Cooper Park Public Restroom Building Reconstruction Completed September 2024
Crispus Attucks Playground Crispus Attucks Playground Reconstruction Completed April 2017
Cypress Hills Playground Cypress Hills Playground Synthetic Turf Field Construction Completed October 2019
De Hostos Playground Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Dean Playground Brooklyn General Site Work (BG-711M) Completed June 2014
DiGilio Playground DiGilio Playground Reconstruction Completed May 2018
Dimattina Playground DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Dimattina Playground Dimattina Playground Ballfield Lighting Reconstruction Completed June 2024
Dome Playground Dome Playground Basketball and Handball Courts Reconstruction Completed March 2018
Dome Playground Dome Playground Play Area and Lawn Reconstruction Completed April 2016
Dyker Beach Park Dyker Beach Park Paths and Brizzi Playground Reconstruction Completed November 2014
Dyker Beach Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Dyker Beach Park Brooklyn Multipurpose Play Areas Reconstruction Completed November 2023
Dyker Beach Park Dyker Beach Park Ballfield Lighting Reconstruction Completed June 2024
Dyker Beach Park Dyker Beach Park Synthetic Turf Soccer Field Reconstruction Completed June 2018
El Shabazz Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
El Shabazz Playground Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M) Completed March 2019
El Shabazz Playground Citywide Public Restroom Building and Facility Reconstruction (CNYG-814MA) Completed May 2019
Eleanor Roosevelt Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Eleanor Roosevelt Playground Brooklyn War Memorial Restroom and Eleanor Roosevelt Playground Public Restroom Building Reconstruction Completed April 2023
Ennis Playground Ennis Playground Reconstruction Completed July 2019
Epiphany Playground Epiphany Playground Reconstruction Completed March 2024
Escape To Nature Brooklyn Community Garden Water Service Installation Completed November 2022
Fidler-Wyckoff House Park Wyckoff House Park Public Restroom Building Construction Completed April 2024
Fidler-Wyckoff House Park Wyckoff House Pavement Reconstruction Completed October 2020
Fidler-Wyckoff House Park Wyckoff House Roof Reconstruction Completed June 2018
Fort Greene Park Fort Greene Park Willoughby Avenue Entrance Reconstruction Completed December 2015
Fort Hamilton Athletic Field Fort Hamilton Park Sport Courts Reconstruction Completed June 2022
Friends Field Friends Field Field House Roof Reconstruction Completed July 2022
Friends Field Friends Field Playground Expansion Completed December 2019
Frost Playground Frost Playground Basketball Courts Reconstruction Completed August 2024
Fulton Park Fulton Park Public Restroom Building Reconstruction Completed May 2019
Glenwood Playground Glenwood Playground Synthetic Turf Field Construction Completed April 2017
Glenwood Playground Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Grace Playground Grace Playground Reconstruction Completed March 2023
Gravesend Park Gravesend Park Playground and Court Area Reconstruction Completed October 2016
Gravesend Park Gravesend Park Public Restroom Building Construction Completed June 2017
Green Central Knoll Green Central Knoll Public Restroom Building Construction Completed August 2019
Green Valley Garden Brooklyn Community Garden Water Service Installation Completed November 2022
Hamilton Metz Field Brooklyn General Site Work (BG-711M) Completed June 2014
Hamilton Metz Field Hamilton-Metz Field Synthetic Turf Field Reconstruction Completed January 2021
Harold Ickes Playground Harold Ickes Playground BMX Bike & Skate Park and Multipurpose Play Area Construction Completed January 2024
Harry Chapin Playground Harry Chapin Playground Sprinkler Reconstruction Completed November 2019
Harry Maze Playground Harry Maze Playground Security Lighting Installation Completed May 2017
Harry Maze Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Heckscher Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Heckscher Playground Heckscher Playground Synthetic Turf Field Construction and Sports Courts Reconstruction Completed June 2016
Heckscher Playground Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Hendrick I. Lott House Lott House Landscape Reconstruction Completed May 2015
Herbert Von King Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Herbert Von King Park Von King Cultural Arts Center Multipurpose Room Reconstruction Completed July 2022
Hickman Playground Hickman Playground and Harry Maze Playground Multipurpose Field Reconstruction Completed August 2016
Highland Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Highland Park Childrens Garden Queens General Site Work (QG-713MA) Completed November 2016
Hilltop Playground Hilltop Playground Reconstruction Completed July 2017
Homecrest Playground Homecrest Playground Reconstruction Completed July 2020
Hooper Grove Hooper Grove Community Garden Fence Reconstruction Completed March 2020
Hope Ballfield Hope Ballfield Reconstruction Completed May 2019
Howard Playground Howard Park Pool Deck Reconstruction Completed February 2023
Howard Playground Howard Playground Howard Pool Tunnel Wall Reconstruction Completed May 2022
Jackie Robinson Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Jackie Robinson Playground Jackie Robinson Playground and Colonel David Marcus Southeast Playground Reconstruction Completed August 2016
Jacob Joffe Fields Jacob Joffe Fields Adult Fitness Area Construction and Sport Courts Reconstruction Completed April 2019
Jacob Joffe Fields Jacob Joffe Fields Playground Reconstruction Completed March 2020
Jaime Campiz Playground Jaime Campiz Playground Basketball Courts and Adult Fitness Area Reconstruction Completed August 2018
Jesse Owens Playground Jesse Owens Playground Reconstruction Completed November 2019
Jesse Owens Playground Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction Completed June 2019
John Allen Payne Playground John Allen Payne Playground Reconstruction Completed July 2018
John J Carty Park John J Carty Park Tennis Courts Reconstruction Completed November 2020
John J Carty Park John J. Carty Park Playground Reconstruction Completed January 2024
Kaiser Park Kaiser Park Telecommunication Lines Reconstruction Completed November 2022
Kelly Park Playground Kelly Park Playground Reconstruction Completed August 2024
Kelly Park Playground Kelly Park Public Restroom Building Reconstruction Completed July 2024
Kelly Park Playground Kelly Playground Reconstruction Completed September 2023
Kolbert Playground Kolbert Park Sidewalks Reconstruction Completed October 2020
Kolbert Playground Kolbert Playground Reconstruction Completed April 2018
Kosciuszko Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Kosciuszko Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Kosciuszko Pool Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
La Guardia Playground La Guardia Playground Reconstruction Phase 1 Completed October 2020
La Guardia Playground La Guardia Playground Reconstruction Phase 2 Completed June 2022
Lafayette Playground Lafayette Playground Reconstruction Completed July 2019
Leif Ericson Park Leif Ericson Park Public Restroom Building Construction Completed December 2015
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Pavement Reconstruction Completed March 2023
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Playground Reconstruction Completed January 2019
Lincoln Terrace / Arthur S. Somers Park Lincoln Terrace Park Tennis Courts Reconstruction Completed November 2013
Linden Park Linden Park Handball Court and Bayview Playground Baseball Field Reconstruction Completed June 2014
Linden Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Linden Park Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Linden Park Linden Park Adult Fitness Area Construction Completed October 2016
Linden Park Linden Park Playground Reconstruction Completed January 2024
Linden Park Linden Park Synthetic Turf Field and Rubberized Track Reconstruction Completed October 2019
Lindower Park Lindower Park Ballfield Reconstruction Completed December 2015
Lion's Pride Playground Lion's Pride Playground Reconstruction Completed April 2023
Lott Park Brooklyn General Site Work (BG-1007M) Completed October 2013
Lt. Federico Narvaez Tot Lot Lt. Federico Narvaez Tot Lot Reconstruction Completed March 2021
Lt. Joseph Petrosino Park Lt. Joseph Petrosino Park Reconstruction Completed January 2019
Luna Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Manhattan Beach Park Brooklyn General Site Work (BG-711M) Completed June 2014
Manhattan Beach Park Manhattan Beach Center Promenade Pavement Reconstruction Completed December 2021
Manhattan Beach Park Manhattan Beach Dog Run Reconstruction Completed March 2020
Manhattan Beach Park Manhattan Beach Promenade Pavement Reconstruction Completed July 2020
Manhattan Beach Park Manhattan Beach Sport Courts Reconstruction Completed April 2018
Marcy Green Center Marcy Green Park Reconstruction Completed April 2023
Marcy Green North Marcy Green Park Reconstruction Completed April 2023
Marcy Green South Marcy Green Park Reconstruction Completed April 2023
Maria Hernandez Park Maria Hernandez Park Synthetic Turf Field Construction Completed June 2022
Marine Park Dr. John's Playground Paths, Water Supply & Drainage System Reconstruction Completed April 2018
Marine Park Lew Fidler Park Construction Completed March 2021
Marine Park Marine Park Bike Path Restoration Completed December 2014
Marine Park Marine Park Bocce Courts and Sport Courts Reconstruction Completed December 2016
Marine Park Marine Park Gerritsen Avenue Pedestrian Path Construction Phase 1 Completed April 2017
Marine Park Marine Park Gerritsen Avenue Pedestrian Path Construction Phase 2 Completed October 2019
Marine Park Marine Park Golf Course Path Reconstruction Completed October 2023
Marine Park Marine Park Oval Path Reconstruction Completed October 2024
Marine Park Marine Park Salt Marsh Nature Center Reconstruction Completed March 2023
Marine Park Marine Park Seba Playground Expansion Completed May 2014
Marine Park Marine Park Veterans Memorial Reconstruction Completed October 2018
Marlboro Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
Marlboro Playground Marlboro Playground Security Lighting Installation Completed March 2017
Martin Luther King Jr. Playground Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Martinez Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
McCarren Park Brooklyn General Site Work (BG-711M) Completed June 2014
McCarren Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
McCarren Park Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
McCarren Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
McCarren Park McCarren Park Bathhouse Roof & Exterior Walls Reconstruction Completed June 2024
McCarren Park McCarren Park Pool & Bath House Reconstruction Completed June 2014
McCarren Park McCarren Park Pool Tub Expansion Joint Reconstruction Completed May 2023
McCarren Park McCarren Park Synthetic Turf Soccer Field Reconstruction Completed January 2019
McDonald Playground McDonald Playground Reconstruction Completed May 2023
McGuire Fields Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
McKinley Park McKinley Park and Seth Low Playground Synthetic Turf Field Construction Completed September 2017
Mellett Playground Mellett Playground Reconstruction Completed June 2022
Metropolitan Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Msgr. McGolrick Park McGolrick Park Paths Reconstruction Completed December 2022
Msgr. McGolrick Park McGolrick Park Playground Reconstruction Completed September 2018
Multisite in Brooklyn Brooklyn General Site Work (BG-711M) Completed June 2014
Nautilus Playground Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Nautilus Playground Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Nautilus Playground Nautilus Playground Sports Courts Reconstruction Completed June 2016
Newport Playground Newport Playground Public Restroom Building Reconstruction Completed November 2020
Newport Playground Newport Playground Reconstruction Completed July 2019
North 5th Street Pier and Park North 5th Street Pier and Park Bulkhead Reconstruction (Hurricane Sandy) Completed September 2018
North 5th Street Pier and Park North 5th Street Pier and Park Pavement Reconstruction Completed April 2022
Nostrand Playground Nostrand Playground Sport Courts Reconstruction Completed August 2019
Ocean Hill Playground Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Ocean Hill Playground Ocean Hill Playground Reconstruction Completed December 2023
Ocean Parkway Malls Brooklyn General Site Work For Hurricane Sandy (BG-1113M) Completed December 2016
Ocean Parkway Malls Ocean Parkway Malls and Colonel David Marcus Playground Reconstruction Completed October 2014
Ocean Parkway Malls Ocean Parkway Malls Reconstruction, Shore Pkwy to Sea Breeze Ave Completed May 2014
Osborn Playground Osborn Playground Multi-Purpose Area Reconstruction Completed June 2022
Owl's Head Park DiMattina Park, Dyker Beach Park, and Owl's Head Park Dog Run Reconstruction Completed March 2015
Owl's Head Park Owl's Head Park Flagpole Installation Completed March 2016
P.S. 125 Playground P.S. 125 Playground Reconstruction Completed September 2023
P.S. 4 Paradise Garden Brooklyn Community Garden Water Service Installation Completed November 2022
Paerdegat Basin Park Paerdegat Athletic Center Air Conditioning Reconstruction Completed March 2020
Paerdegat Basin Park Paerdegat Athletic Center Boiler Reconstruction Completed February 2023
Paerdegat Basin Park Paerdegat Basin Yacht Club Parking Lot Reconstruction Completed June 2018
Paerdegat Park Paerdegat Park Basketball Court Reconstruction Completed March 2015
Parade Ground Parade Ground Parks Enforcement Facility Windows, Storefront and HVAC Reconstruction Completed May 2024
Parade Ground Prospect Park Parade Ground Ball Field Lighting Fixture Replacement Completed June 2023
Park Gateway Estates Phase II Park Construction Completed September 2023
Park Ocean Parkway Sitting Areas Reconstruction Completed April 2024
Patrick O'Rourke Playground Brooklyn Multipurpose Play Areas Reconstruction Completed November 2023
Patrick O'Rourke Playground Patrick O'Rourke Playground Reconstruction Completed September 2016
Penn Triangle Penn Triangle Reconstruction Completed December 2020
Pfc Norton Playground PFC Norton Playground Public Restroom Building Reconstruction Completed November 2014
Pink Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Poseidon Playground Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Potomac Playground Brooklyn Basketball Courts Reconstruction Completed January 2024
Powell Playground Powell Park Adult Fitness Area Construction and Athletic Court Reconstruction Completed October 2016
Prospect Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Prospect Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Prospect Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Prospect Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Prospect Park Brooklyn Boiler & Heating Systems Reconstruction (BG-611M) Completed June 2014
Prospect Park Litchfield Villa Telecommunications Installation Completed June 2015
Prospect Park Prospect Park Litchfield Villa Boiler and HVAC Systems Reconstruction Completed December 2015
Public Place Public Place Mall Paving Reconstruction Completed January 2020
Pulaski Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
Quaker Parrot Park at the Dust Bowl Quaker Parrot Park Dust Bowl Synthetic Turf Field Reconstruction Completed September 2022
Rainbow Playground Rainbow Playground Reconstruction Completed October 2023
Raymond Bush Playground Raymond Bush Playground Drainage Line Reconstruction Completed September 2022
Red Hook Recreation Area Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Red Hook Recreation Area Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Red Hook Recreation Area Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Red Hook Recreation Area Red Hook Community Farm Water Service Construction Completed March 2023
Red Hook Recreation Area Red Hook Pool Reconstruction Completed June 2018
Red Hook Recreation Area Red Hook Pool Tub Expansion Joint Reconstruction Completed May 2023
Red Hook Recreation Area Red Hook Recreation Area Ballfield 9 and Soccer Field 2 Reconstruction Completed September 2023
Red Hook Recreation Area Red Hook Recreation Area Ballfields 5-8 Reconstruction Completed December 2021
Red Hook Recreation Area Red Hook Recreation Center Sandy-Related Emergency Boiler Reconstruction Completed June 2014
Rudd Playground Rudd Playground Skate Park and Basketball Courts Reconstruction Completed September 2020
Samuel Goldberg Triangle Samuel Goldberg Triangle Reconstruction Completed February 2019
Sarah J.S. Tompkins Garnet Playground Sarah J.S. Tompkins Garnet Playground Basketball Courts Reconstruction Completed July 2024
Saratoga Park Saratoga Park Memorial Reconstruction Completed August 2014
Saratoga Park Saratoga Park Playground Reconstruction Completed January 2023
Seeley Park Seeley Park Reconstruction Completed December 2014
Seth Low Playground/ Bealin Square Lincoln Terrace Park Netball Court and Seth Low Playground Athletic Court Reconstruction Completed August 2016
Seth Low Playground/ Bealin Square McKinley Park and Seth Low Playground Synthetic Turf Field Construction Completed September 2017
Shore Park and Parkway Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Shore Park and Parkway Shore Park and Parkway Dog Run Construction Completed August 2023
Shore Park and Parkway Shore Park and Parkway Field House Reconstruction Completed November 2021
Shore Park and Parkway Shore Park and Parkway Path and Pavement Reconstruction Completed July 2023
Shore Park and Parkway Shore Park and Parkway Steel Fence Installation, Vegetation Removal and Erosion Control Completed June 2019
Sixteen Sycamores Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Sixteen Sycamores Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Sixteen Sycamores Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Sixteen Sycamores Playground Brooklyn General Site Work (BG-1007M) Completed October 2013
South Oxford Park Brooklyn General Site Work (BG-711M) Completed June 2014
Sperandeo Brothers Playground Sperandeo Brothers Playground Synthetic Turf Reconstruction Completed September 2023
Sperandeo Brothers Playground Sperandeo Playground Sport Courts Reconstruction Completed November 2018
Spring Creek Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Spring Creek Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
St. John's Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
St. John's Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
St. John's Park St. John's Park Sitting Area Reconstruction Completed May 2015
St. John's Park St. John's Recreation Center Adult Fitness Area Construction Completed August 2022
St. John's Park St. John's Recreation Center Boilers and HVAC Systems Reconstruction Completed March 2022
St. John's Park St. John's Recreation Center Public Restroom Building Construction Completed April 2019
St. John's Park St. John's Recreation Center Telecommunication Lines Reconstruction Completed November 2022
St. Mary's Park St. Mary's Playground Multi-Purpose Area Reconstruction Completed July 2019
St. Mary's Park St. Mary's Playground Reconstruction Completed April 2018
Star Spangled Playground Brooklyn Basketball Courts Reconstruction Completed January 2024
Sternberg Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Sternberg Park Sternberg Park Synthetic Turf Field Reconstruction Completed October 2021
Stockton Playground Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction Completed June 2019
Stockton Playground Stockton Playground Reconstruction Completed April 2018
Stroud Playground Jesse Owens, Stockton and Stroud Playgrounds Public Restroom Building Reconstruction Completed June 2019
Stroud Playground Stroud Playground Reconstruction Completed January 2019
Success Garden Success Garden Reconstruction Completed February 2022
Sumner Playground Citywide Electrical Systems Reconstruction (CNYG-914M) Completed March 2019
Sumner Playground Sumner Playground Public Restroom Building Reconstruction Completed December 2021
Sumner Playground Sumner Playground Reconstruction Completed October 2018
Sunners Playground Sunners Playground Reconstruction Completed May 2023
Sunset Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Sunset Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Sunset Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Sunset Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sunset Park Sunset Park Adult Fitness Area Construction Completed December 2018
Sunset Park Sunset Park Handball Court Reconstruction Completed August 2022
Sunset Park Sunset Park Path Reconstruction Completed October 2020
Sunset Park Sunset Park Pavement, Fencing, and Bench Reconstruction Completed December 2018
Sunset Park Sunset Park Playground Play Equipment and Safety Surfacing Reconstruction Completed July 2019
Sunset Park Sunset Park Playground Reconstruction Completed July 2017
Sunset Park Sunset Park Pool Electrical System Reconstruction Completed February 2023
Sunset Park Sunset Park Pool Structural Reconstruction Completed January 2023
Sunset Park Sunset Park Recreation Center Telecommunication Lines Reconstruction Completed March 2022
Sunset Park Sunset Park Spray Shower Construction Completed October 2014
Sunset Park Sunset Park Spray Shower Reconstruction Completed May 2018
Surf Playground Surf Playground Play Area Reconstruction Completed June 2016
Surf Playground Surf Playground Synthetic Turf Field Construction and Basketball Courts Reconstruction Completed November 2021
Surfside Multi-Cultural Garden Coalition Brooklyn Community Garden Water Service Installation Completed November 2022
Susan Smith McKinney Steward Park Susan Smith McKinney Steward Park Reconstruction Completed August 2022
Taaffe Playground Brooklyn Basketball Courts Reconstruction Completed January 2024
Taaffe Playground Taaffe Playground Reconstruction Completed September 2016
Ten Eyck Playground Luther Gulick and Yolanda Garcia Park, Lyons Square, Saw Mill, and Ten Eyck Playgrounds Public Restroom Building Construction Completed October 2020
Ten Eyck Playground Ten Eyck Playground Reconstruction Completed April 2018
Ten Eyck Plaza Ten Eyck Plaza Reconstruction Completed December 2022
Thomas Boyland Park Thomas Boyland Park Reconstruction Completed August 2017
Thomas Greene Playground Thomas Greene Playground Pool Reconstruction Completed June 2017
Thomas Greene Playground Thomas Greene Playground Reconstruction Completed June 2015
Thomas J. Cuite Park Thomas J. Cuite Park Water Service Installation Completed February 2019
Tilden Playground Banneker Playground and Tilden Playground Public Restroom Building Reconstruction Completed January 2023
Tilden Playground Pulaski and Tilden Playground Tennis Court and Play Area Reconstruction Completed October 2013
United Community Center Brooklyn Community Garden Water Service Installation Completed November 2022
Various locations Brooklyn Street Tree Planting FY23 - Community Boards 12 &14 (BG-1619MR) Completed October 2023
Various locations in Brooklyn Brooklyn Park Tree Planting FY21 (BG-1119M) Completed November 2023
Various locations in Brooklyn Brooklyn Park Tree Planting FY21 (BG-321M) Completed June 2022
Various locations in Brooklyn Brooklyn PLANYC Street Tree Planting - FY22 Community Boards 5, 16 Completed March 2024
Various locations in Brooklyn Brooklyn Sandy-Related Tree Removal - Community Boards 1-6 Completed June 2015
Various locations in Brooklyn Brooklyn Sandy-Related Tree Removal - Community Boards 7-18 Completed June 2016
Various locations in Brooklyn Brooklyn Street Tree Planting FY16 - Community Boards 1-4 Completed January 2017
Various locations in Brooklyn Brooklyn Street Tree Planting FY16 - Community Boards 11,13-15,18 Completed September 2017
Various locations in Brooklyn Brooklyn Street Tree Planting FY16 - Community Boards 5,8,9,16,17 Completed January 2017
Various locations in Brooklyn Brooklyn Street Tree Planting FY16 - Community Boards 6,7,10,12 Completed September 2017
Various locations in Brooklyn Brooklyn Street Tree Planting FY17 - Community Boards 1-4,16 Completed January 2019
Various locations in Brooklyn Brooklyn Street Tree Planting FY17 - Community Boards 11,13,15 Completed August 2018
Various locations in Brooklyn Brooklyn Street Tree Planting FY17 - Community Boards 6,7,10,12 Completed July 2018
Various locations in Brooklyn Brooklyn Street Tree Planting FY17 - Community Boards 8,9,17 Completed October 2018
Various locations in Brooklyn Brooklyn Street Tree Planting FY18 - Community Boards 5,14,18 Completed December 2019
Various locations in Brooklyn Brooklyn Street Tree Planting FY18 - Community Boards 6,7,10,12 Completed December 2019
Various locations in Brooklyn Brooklyn Street Tree Planting FY19 - Community Boards 11,13,15 Completed May 2019
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 1-4 Completed January 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 11,13 Completed February 2021
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 15,18 Completed October 2020
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 5,8,16 Completed October 2020
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 6,7,10,12 Completed January 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY20 - Community Boards 9,14,17 Completed October 2020
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 1, 3, 4, 5, 16 Completed June 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 1, 4 Completed April 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 11, 13, 15 Completed July 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 12, 14 (BG-1619M) Completed July 2022
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 2-3 Completed April 2023
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 2, 6, 7, 10 Completed February 2023
Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 8, 9, 17, 18 Completed August 2024
Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 1, 4 Completed June 2023
Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 11, 13, 15 Completed June 2024
Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 2-3 Completed February 2024
Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 6, 7, 10 Completed August 2024
Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Council District 38 Completed January 2023
Various locations in Brooklyn Brooklyn Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 1-6,8,9,14,16,17 Completed March 2021
Various locations in Brooklyn Brooklyn Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 7, 10-13, 15, 18 Completed August 2022
Various locations in Brooklyn Community Board 2. Brooklyn Street Tree Planting FY10 - Community Board 2 Completed November 2013
Various locations, Brooklyn Brooklyn Sandy-Related Tree Replacement Completed November 2015
Various locations, Brooklyn Brooklyn Street Tree Planting & Invasive Species Removal FY11 Completed April 2014
Various locations, Brooklyn Brooklyn Street Tree Planting FY11 - Community Boards 7,10-15,17,18 (BG-511MR) Completed April 2015
Various locations, Brooklyn Brooklyn Street Tree Planting FY13 - Community Boards 1-6,8,9,16 Completed April 2014
Various locations, Brooklyn Brooklyn Street Tree Planting FY13 - Community Boards 5,16,17,18 Completed March 2014
Various locations, Brooklyn Brooklyn Street Tree Planting FY14 - Community Boards 1-6,8 Completed March 2015
Various locations, Brooklyn Brooklyn Street Tree Planting FY14 - Community Boards 5,9,16,17,18 Completed March 2015
Various locations, Brooklyn Brooklyn Street Tree Planting FY14 - Community Boards 7,10-15 Completed March 2015
Various locations, Brooklyn Brooklyn Street Tree Planting FY15 - Community Boards 1-4 Completed April 2016
Various locations, Brooklyn Brooklyn Street Tree Planting FY15 - Community Boards 11,13-15,18 Completed April 2016
Various locations, Brooklyn Brooklyn Street Tree Planting FY15 - Community Boards 5,8,9,16,17 Completed July 2016
Various locations, Brooklyn Brooklyn Street Tree Planting FY15 - Community Boards 6,7,10,12 Completed June 2016
Various locations, Brooklyn. Brooklyn Street Tree Planting FY10 (BG-810MA) Completed February 2014
Various locations, in Brooklyn Brooklyn Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 7,10-13,15,18 Completed April 2021
Vernon Cases Community Garden Brooklyn Community Garden Water Service Installation Completed November 2022
Washington Hall Park Washington Hall Playground Basketball Courts Reconstruction Completed February 2024
Washington Park J.J. Byrne Playground Synthetic Turf Lawn Construction Completed March 2019
Weeksville Playground Weeksville Playground Reconstruction Completed September 2019
William Sheridan Playground William Sheridan Playground Reconstruction Completed June 2023
Wilson Playground Brooklyn Multipurpose Play Areas Reconstruction Completed November 2023
Wingate Park Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Wingate Park Wingate Park & Glenwood Playground Reconstruction Completed May 2016
Wingate Park Wingate Park Gym, Heckscher Playground, and Nautilus Playground Reconstruction Completed May 2017
Wingate Park Martin Luther King Jr. Playground Spray Shower, Ocean Hill Playground, and Wingate Park Playground Reconstruction Completed August 2017
Wingate Park Wingate Park Basketball Courts Reconstruction Completed January 2021
PS 192 Playground Reconstruction Phase 2 Completed September 2015

Manhattan Projects

Location Project Phase Completion Date
6BC Botanical Garden 6BC Botanical Garden Water Service Installation Completed August 2024
Abraham Lincoln Playground Abraham Lincoln Playground Public Restroom Building Reconstruction Completed May 2022
Abraham Lincoln Playground Abraham Lincoln Playground Reconstruction Completed May 2022
Abraham Lincoln Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Alexander Hamilton Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Alfred E. Smith Playground Alfred E. Smith Recreation Center Fitness Room Reconstruction Completed December 2023
Alfred E. Smith Playground Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Andrew Haswell Green Park Andrew Haswell Green Searail and Rooftop Sitting Area Construction Completed January 2017
Annunciation Playground Annunciation Playground Synthetic Turf and Track Reconstruction Completed October 2023
Annunciation Playground Manhattan Roofing Systems Reconstruction (MG-215M) Completed March 2019
Asphalt Green Dekovats Playground Safety Surfacing Reconstruction Completed December 2018
Asser Levy Playground Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Asser Levy Playground Manhattan Roofing Systems Reconstruction (MG-215M) Completed March 2019
Asser Levy Playground Asser Levy Playground Expansion Completed October 2014
Asser Levy Playground Asser Levy Recreation Center Boiler and Pool Dehumidifier Reconstruction Completed May 2017
Asser Levy Playground Asser Levy Recreation Center Fitness Room Reconstruction Completed June 2023
Audubon Playground Audubon Playground Public Restroom Building Reconstruction Completed May 2022
Audubon Playground Audubon Playground Reconstruction Completed September 2020
Baruch Playground Baruch Playground Public Restroom Building Reconstruction Completed December 2021
Baruch Playground Manhattan Synthetic Turf Field Reconstruction Completed July 2019
Bellevue South Park Bellevue South Park Landscape Reconstruction Completed November 2013
Bellevue South Park Bellevue South Park Reconstruction Completed June 2023
Bill Bojangles Robinson Playground Bill 'Bojangles' Robinson Playground Reconstruction Completed October 2020
Bleecker Playground Bleecker Playground and Public Restroom Building Reconstruction Completed August 2013
Bloomingdale Playground Bloomingdale Playground Play Area Reconstruction Completed October 2019
Bloomingdale Playground Bloomingdale Playground Public Restroom Building Reconstruction Completed September 2019
Booker T. Washington Playground Booker T. Washington Playground Synthetic Turf Reconstruction Completed September 2021
Booker T. Washington Playground Manhattan General Site Work (MG-914MA) Completed September 2018
Bowery & East 4th Street Bowery & East 4th Street (DEP Site) New Open Space Construction Completed May 2022
Bradhurst Gardens Association Frederick Douglass Boulevard Community Garden Reconstruction Completed October 2021
Brigadier General Charles Young Playground Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
Brigadier General Charles Young Playground Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Broadway Malls Broadway Malls Reconstruction Completed December 2020
Carl Schurz Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Carl Schurz Park Carl Schurz Park Playground Reconstruction Completed October 2020
Carl Schurz Park Carl Schurz Park Security Measures Construction Completed November 2023
Carmansville Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction Completed October 2018
Carmansville Playground Carmansville Playground Reconstruction Completed December 2017
Central Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Central Park Arsenal Building Facade and Roof Reconstruction Completed September 2019
Central Park Arsenal Emergency Elevator Reconstruction Completed September 2017
Charlton Plaza Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation Completed May 2018
Chelsea Green Chelsea Green Construction Completed July 2019
Chelsea Park Manhattan General Site Work (MG-914MA) Completed September 2018
Chelsea Park Chelsea Park Basketball Court Reconstruction Completed June 2023
Chelsea Park Chelsea Park Synthetic Turf and Track Reconstruction Completed September 2023
Chelsea Recreation Center Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Chelsea Recreation Center Chelsea Recreation Center Fitness Room Reconstruction Completed May 2023
Chelsea Recreation Center Chelsea Recreation Center Locker Room Reconstruction Completed March 2020
Chelsea Recreation Center Chelsea Recreation Center Storefront Entry System Reconstruction Completed September 2023
Children's Magical Garden Children's Magical Garden Water Service Construction Completed September 2022
Clement Clarke Moore Park Clement Clarke Moore Park Reconstruction Completed June 2019
Collect Pond Park Collect Pond Park Construction Completed November 2013
Columbus Park Manhattan General Site Work (MG-914MA) Completed September 2018
Columbus Park Columbus Park Mulberry Street Entrance Reconstruction Completed October 2019
Columbus Park Columbus Park Synthetic Turf Field Reconstruction Completed July 2022
Constance Baker Motley Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Constance Baker Motley Recreation Center Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Constance Baker Motley Recreation Center Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Constance Baker Motley Recreation Center Constance Baker Motley Recreation Center Fitness Room Reconstruction Completed June 2023
Constance Baker Motley Recreation Center Constance Baker Motley Recreation Center Indoor Pool Netting Installation Completed September 2022
Corlears Hook Park Corlears Hook Park Dog Run Reconstruction Completed October 2020
Corlears Hook Park Corlears Hook Park Public Restroom Building Reconstruction Completed June 2021
Corlears Hook Park Corlears Hook Park Synthetic Turf Field Reconstruction Completed March 2024
Corporal John A. Seravalli Playground Seravalli Playground Public Restroom Building Reconstruction Completed July 2019
Courtney Callender Playground Courtney Callender Playground Handball Court Pavement Reconstruction Completed August 2021
De Witt Clinton Park Manhattan Synthetic Turf Field Reconstruction Completed July 2019
De Witt Clinton Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
De Witt Clinton Park DeWitt Clinton Park Staircase Reconstruction Completed September 2021
De Witt Clinton Park Manhattan General Site Work (MG-213M) Completed December 2016
De Witt Clinton Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
DeLury Square DeLury Square Reconstruction Completed November 2020
DeSalvio Playground DeSalvio Playground Reconstruction Completed February 2019
Dry Dock Playground Citywide Intermediate Pool Filter Plants Reconstruction Completed April 2023
Dry Dock Playground Dry Dock Playground Reconstruction Completed December 2015
Dry Dock Playground Dry Dock Pool Deck Reconstruction Completed May 2022
East River Esplanade Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
East River Esplanade East River Esplanade Pavement Reconstruction Completed December 2021
East River Esplanade Glick Park Electrical Systems Reconstruction (Hurricane Sandy) Completed June 2019
East River Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
East River Walk East River Esplanade East 76th Street Seawall Reconstruction Completed October 2020
East River Walk East River Esplanade Reconstruction, East 68th-70th Streets Completed May 2022
East River Walk John Finley Walk 82nd Street ADA Ramp Reconstruction Completed March 2020
Elizabeth H. Berger Plaza Elizabeth H. Berger Plaza Construction Completed January 2021
Father Fagan Park Father Fagan Park Sitting Area Reconstruction and Charlton Plaza Water Service Installation Completed May 2018
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Fort Tryon Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Fort Tryon Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Fort Tryon Park Anne Loftus Playground Spray Shower Reconstruction Completed September 2022
Fort Tryon Park Fort Tryon Park Fieldhouse Staircase Reconstruction Completed March 2018
Fort Tryon Park Fort Tryon Park Path and Stair Reconstruction Completed April 2015
Fort Tryon Park Fort Tryon Park Path Reconstruction Completed December 2022
Fort Tryon Park Fort Tryon Park Retaining Wall Reconstruction Completed December 2022
Fort Tryon Park Jacob Javits Playground Reconstruction Completed November 2019
Fort Washington Park Fort Washington Park Ballfields Reconstruction Completed October 2013
Fort Washington Park Fort Washington Park Courts Reconstruction and Playground Construction Completed October 2013
Fort Washington Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Fort Washington Park Fort Washington Park Greenway Construction Completed June 2014
Fort Washington Park Fort Washington Park Retaining Wall Reconstruction Completed December 2022
Fort Washington Park Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy) Completed November 2020
Frederick Douglass Playground Manhattan Synthetic Turf Field Reconstruction Completed July 2019
Frederick Douglass Playground Citywide Intermediate Pool Filter Plants Reconstruction Completed April 2023
Frederick Johnson Playground Frederick Johnson Park Tennis Courts Reconstruction Completed October 2013
Frederick Johnson Playground Frederick Johnson Playground Public Restroom Building Construction Completed January 2024
Frederick Johnson Playground Frederick Johnson Playground Reconstruction Completed July 2021
Gertrude Ederle Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Gertrude Ederle Recreation Center Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Gertrude Ederle Recreation Center Gertrude Ederle Recreation Center Playground Reconstruction Completed September 2016
Grand Street & Lafayette Street Grand and Lafayette Streets (DEP Site) New Open Space Construction Completed April 2022
Green Oasis and Gilbert's Garden Manhattan Community Garden Water Service Installation Completed June 2021
Hamilton Fish Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hamilton Fish Park Citywide Pool Piping Hangers and Supports Reconstruction (CNYG-419M) Completed January 2021
Hamilton Fish Park Hamilton Fish Park Basketball Courts and Adult Fitness Equipment Reconstruction Completed May 2021
Hamilton Fish Park Hamilton Fish Park Pool Filter Plant Façade Stabilization Completed June 2023
Hansborough Recreation Center Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Hansborough Recreation Center Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Hansborough Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Hansborough Recreation Center Hansborough Recreation Center Gym Floor and Window Reconstruction Completed November 2017
Harlem River Park Harlem River Park Synthetic Turf Field Reconstruction Completed September 2022
Hell's Kitchen Park Manhattan General Site Work (MG-213M) Completed December 2016
Hell's Kitchen Park Hell's Kitchen Park Pavement Reconstruction Completed August 2023
Henry M. Jackson Playground Henry M. Jackson Playground Reconstruction Completed June 2017
Highbridge Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Highbridge Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Highbridge Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Highbridge Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Highbridge Park Citywide Olympic Pool Mechanical Systems Reconstruction Completed January 2024
Highbridge Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Highbridge Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Highbridge Park Highbridge Anchor Park Reconstruction Phase I Completed April 2021
Highbridge Park Highbridge Anchor Park Reconstruction Phase II Completed November 2020
Highbridge Park Highbridge Park Brush Stairway Reconstruction Completed February 2014
Highbridge Park Highbridge Park Dyckman Rest Reconstruction Completed July 2024
Highbridge Park Highbridge Park Public Restroom Building Construction Completed February 2024
Highbridge Park Highbridge Park Water Tower Reconstruction Completed October 2021
Honey Locust Park Honey Locust Park Reconstruction Completed September 2022
Howard Bennett Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Inwood Hill Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Inwood Hill Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Inwood Hill Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Inwood Hill Park Fort Washington Park Dyckman Street Ramp Construction and Inwood Hill Park Entrance Reconstruction Completed June 2015
Inwood Hill Park Inwood Hill Nature Center Post-Sandy Reconstruction Completed September 2023
Inwood Hill Park Inwood Hill Park Adult Fitness Equipment Construction Completed October 2018
Inwood Hill Park Inwood Hill Park Little League Baseball Field Reconstruction Completed May 2014
Inwood Hill Park Inwood Hill Park Nature Center Sewer Connection Construction Completed July 2018
Inwood Hill Park Inwood Hill Park Paths Reconstruction Completed August 2022
Isham Park Isham Park Water System Reconstruction Completed April 2015
J. Hood Wright Park J. Hood Wright Park Adult Fitness Equipment Construction Completed December 2018
J. Hood Wright Park J. Hood Wright Park Recreation Center HVAC Reconstruction Completed June 2014
Jackie Robinson Community Garden Manhattan Community Garden Water Service Installation Completed June 2021
Jackie Robinson Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Jackie Robinson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Jackie Robinson Park Citywide Olympic Pool Mechanical Systems Reconstruction Completed January 2024
Jackie Robinson Park Citywide Pool Piping Hangers and Supports Reconstruction (CNYG-419M) Completed January 2021
Jackie Robinson Park Jackie Robinson Park Reconstruction (M014-117M) Completed May 2020
Jackie Robinson Park Jackie Robinson Recreation Center Exterior Facade & Roofing Reconstruction Completed March 2020
Jackson Square Jane Street Garden Fence Construction and Jackson Square Park Reconstruction Completed February 2019
Jacob H. Schiff Playground Jacob H. Schiff Playground Basketball and Handball Courts Reconstruction Completed August 2020
Jacob H. Schiff Playground Jacob Schiff Playground Sitting Area Reconstruction Completed June 2023
Jacob H. Schiff Playground Jacob Schiff Playground Synthetic Turf Field Reconstruction Completed November 2022
James J Walker Park James J. Walker Park Synthetic Turf Ballfield Construction Completed August 2013
James Madison Plaza James Madison Plaza Reconstruction Completed October 2013
James Weldon Johnson Playground James Weldon Johnson Playground Reconstruction Completed February 2018
Jane Street Garden Jane Street Garden Fence Construction and Jackson Square Park Reconstruction Completed February 2019
Joan Of Arc Park Joan of Arc Park Reconstruction and Riverside Park Adult Fitness Equipment Installation Completed October 2019
John Jay Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
John Jay Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
John Jay Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
John Jay Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
John Jay Park John Jay Park Pool Deck Reconstruction Completed May 2024
John Jay Park John Jay Park Ramp Construction Completed June 2024
John Jay Park John Jay Park Sitting Area Reconstruction Completed May 2022
John Jay Park Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy) Completed February 2015
John V. Lindsay East River Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
John V. Lindsay East River Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
John V. Lindsay East River Park East River Park East 6th Street Synthetic Turf Soccer Field & Running Track Reconstruction Completed September 2018
Joseph C. Sauer Park Joseph Sauer Park Reconstruction Completed December 2020
La Guardia Playground LaGuardia Corner Garden Fence Reconstruction Completed January 2020
La Plaza Cultural La Plaza Cultural Community Garden Reconstruction Completed July 2019
Langston Hughes Playground Langston Hughes Playground Public Restroom Building Reconstruction Completed May 2018
Langston Hughes Playground Playground 103 and Langston Hughes Playground Reconstruction Completed May 2018
Little Flower Playground Little Flower Playground Synthetic Turf Field Construction Completed September 2020
Luther Gulick Park Luther Gulick and Yolanda Garcia Park, Lyons Square, Saw Mill, and Ten Eyck Playgrounds Public Restroom Building Construction Completed October 2020
Luther Gulick Park Luther Gulick Park Reconstruction Completed September 2020
Madison Square Park Madison Square Park Pavement Reconstruction Completed May 2023
Maggie's Magic Garden Manhattan Community Garden Water Service Installation Completed June 2021
Marcus Garvey Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Marcus Garvey Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Marcus Garvey Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Marcus Garvey Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Marcus Garvey Park Marcus Garvey Park Fire Watchtower Dismantling Completed June 2015
Marcus Garvey Park Marcus Garvey Park Fire Watchtower Restoration Completed December 2019
Marcus Garvey Park Marcus Garvey Park Pelham Fritz Recreation Center Reconstruction Completed April 2022
Marcus Garvey Park Marcus Garvey Park POP Office Roof Reconstruction Completed August 2023
Marcus Garvey Park Marcus Garvey Park Public Restroom Building Construction Completed July 2021
Martin Luther King, Jr. Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction Completed October 2018
Martin Luther King, Jr. Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Martin Luther King, Jr. Playground Martin Luther King Jr. Playground Reconstruction Completed January 2018
Mary O'Connor Playground Mary O'Connor and Tudor Grove Playground Reconstruction Completed August 2023
Mathews-Palmer Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Mathews-Palmer Playground Mathews-Palmer Playground Reconstruction Completed April 2018
Matthew P. Sapolin Playground Matthew P. Sapolin Playground Multipurpose Play Area Reconstruction Completed June 2024
Matthew P. Sapolin Playground Matthew P. Sapolin Playground Sewer Service Reconstruction Completed August 2024
McCaffrey Playground Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
McKinley Playground McKinley Playground Play Area Reconstruction Completed September 2021
McKinley Playground McKinley Playground Public Restroom Building Reconstruction Completed July 2021
Monsignor Kett Playground Monsignor Kett Playground Reconstruction Completed July 2023
Morningside Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Morningside Park Morningside Park 123rd Street Playground Reconstruction Phase 2 Completed March 2019
Morningside Park Morningside Park 123rd Street Playground Reconstruction Phase I Completed July 2013
Morningside Park Morningside Park Middle Playground and Basketball Courts Reconstruction Completed March 2021
Morningside Park Morningside Park Paths Reconstruction Completed May 2023
Orchard Alley Garden Manhattan General Site Work (MG-213M) Completed December 2016
P.S. 155 Playground P.S. 155 Playground Reconstruction Completed January 2024
Peck Slip Peck Slip Reconstruction Completed January 2021
Playground 103 CIII Playground 103 and Langston Hughes Playground Reconstruction Completed May 2018
Playground Eighty Nine LXXXIX Playground Eighty Nine Reconstruction Completed January 2016
Playground One Playground One Reconstruction Completed July 2020
Playground One Twenty Five CXXV Manhattan Basketball Court Reconstruction Completed March 2018
Pleasant Village Community Garden Manhattan Community Garden Water Service Installation Completed June 2021
Poor Richard's Playground Poor Richard's Playground Entry Path Reconstruction Completed August 2019
Poor Richard's Playground Poor Richard's Playground Play Area Reconstruction Completed June 2023
Ramon Aponte Park Ramon Aponte Park Reconstruction Completed June 2016
Randall's Island Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Randall's Island Park 5 Boro Complex and Garage Parking Lot Reconstruction Completed October 2020
Randall's Island Park Icahn Stadium Electrical Service Reconstruction Completed June 2022
Randall's Island Park Randall's Island Emergency Utility Transformer Systems Reconstruction Completed January 2019
Randall's Island Park Randall's Island Park Citywide Services Complex Fleet Shop Exhaust System Reconstruction Completed October 2023
Randall's Island Park Randall's Island PEP Academy Complex Reconstruction Completed July 2020
Randall's Island Park Randall's Island Western Shore Reconstruction Completed March 2019
Riverside Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Riverside Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Riverside Park Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy) Completed November 2020
Riverside Park Joan of Arc Park Reconstruction and Riverside Park Adult Fitness Equipment Installation Completed October 2019
Riverside Park Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction Completed November 2018
Riverside Park Riverside Drive Bus Stop and Safety Measure Installation Completed October 2020
Riverside Park Riverside Park 102nd Street Field House Water Service Installation Completed January 2019
Riverside Park Riverside Park 102nd Street Staircase Reconstruction Completed June 2023
Riverside Park Riverside Park 105th Street Paths Reconstruction Completed October 2023
Riverside Park Riverside Park 109th Street Skate Park Reconstruction Completed December 2020
Riverside Park Riverside Park 148th Street Paths Reconstruction Completed October 2023
Riverside Park Riverside Park 79th Street Boat Basin Dock A Reconstruction Completed June 2016
Riverside Park Riverside Park 83rd Street Paths Reconstruction Completed June 2022
Riverside Park Riverside Park 97th Street Paths Reconstruction Completed May 2022
Riverside Park Riverside Park Fence and Pavement Reconstruction Completed December 2015
Riverside Park Riverside Park Path Reconstruction, West 72-83, 91-95, 122-125 Streets Completed June 2019
Riverside Park Riverside Park Tiemann Place Stairs and Sidewalk Reconstruction Completed June 2015
Riverside Park Riverside Park West 91st-96th Streets Sidewalk Reconstruction Completed October 2017
Riverside Park West 102nd Street Riverside Park Field House Interior Plumbing Reconstruction Completed November 2019
Riverside Park South Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy) Completed November 2020
Riverside Park South Riverside Park South Natural Turf Ballfield & Greenway Reconstruction Completed June 2022
Riverside Park South Riverside Park South Playground, Bikeway, and Plazas Construction Completed September 2020
Robert L. Clinkscales Playground and Community Garden Robert Clinkscales Playground and Community Garden Reconstruction Completed May 2014
Roger Morris Park Morris-Jumel Mansion Streetscape Reconstruction Completed February 2016
Sakura Park Sakura Park Stairs Reconstruction Completed November 2021
Samuel N. Bennerson 2nd Playground Bennerson Playground Reconstruction Completed January 2018
Sara D. Roosevelt Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Sara D. Roosevelt Park Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction Completed March 2024
Sara D. Roosevelt Park Sara D. Roosevelt Park Central Communications Office Restrooms Reconstruction Completed May 2022
Sara D. Roosevelt Park Sara D. Roosevelt Park Public Restroom Building Reconstruction Completed January 2020
Septuagesimo UNO Manhattan General Site Work (MG-213M) Completed December 2016
Seward Park Manhattan Roofing Systems Reconstruction (MG-614M) Completed September 2017
Seward Park Manhattan Basketball Court Reconstruction Completed March 2018
Seward Park Seward Park Reconstruction Completed November 2019
Sheltering Arms Playground Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Sheltering Arms Playground Sheltering Arms Pool Deck Reconstruction Completed April 2024
Sherman Creek Sherman Creek Entrance, Path, and Fencing Construction Completed May 2014
Sherman Creek Sherman Creek Water Service Installation Completed March 2018
Sol Bloom Playground Sol Bloom Playground Basketball Court Reconstruction Completed August 2024
Sol Lain Plgd Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction Completed October 2018
Sol Lain Plgd Sol Lain Playground Reconstruction Completed September 2017
Spring Street Park Spring Street Park Reconstruction Completed September 2018
St. Gregory's Playground St. Gregory's Playground Reconstruction Completed September 2019
St. Nicholas Park Grant's Tomb Bluestone Pavement and St. Nicholas Park Dog Run Path and Steps Reconstruction Completed November 2018
St. Nicholas Park St. Nicholas Park Paths Reconstruction Completed December 2023
St. Nicholas Park St. Nicholas Park Rockface Reconstruction Completed April 2022
Stuyvesant Square Stuyvesant Square East Section Fence and Sidewalk Reconstruction Completed December 2016
Sutton Place Park Sutton Place Park Reconstruction Completed July 2019
The Battery Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
The Battery Battery Park Coast Guard Monument Relocation Completed September 2021
The Battery Battery Park Playground Reconstruction Completed December 2021
The Battery Battery Park Public Restroom Building and Sphere Reconstruction Completed September 2014
The Battery Battery Town Green and Battery Bikeway Construction Completed October 2015
Theodore Roosevelt Park Theodore Roosevelt Park Dog Run Reconstruction Completed July 2020
Theodore Roosevelt Park Theodore Roosevelt Park Pavement Reconstruction Completed November 2013
Thomas Jefferson Park Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015
Thomas Jefferson Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Thomas Jefferson Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Thomas Jefferson Park Manhattan Basketball Court Reconstruction Completed March 2018
Thomas Jefferson Park Thomas Jefferson Park East Harlem Skate Park Construction Completed September 2017
Thomas Jefferson Park Thomas Jefferson Park Irrigation Installation Completed September 2019
Thomas Jefferson Park Thomas Jefferson Park Playground Reconstruction Completed January 2021
Tompkins Square Park Tompkins Square Park Multipurpose Play Area Reconstruction Completed November 2023
Tompkins Square Park Tompkins Square Playground Reconstruction Completed September 2019
Tony Dapolito Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Tony Dapolito Recreation Center Tony Dapolito Recreation Center and John Jay Pool Boiler Systems Reconstruction (Hurricane Sandy) Completed February 2015
Trygve Lie Plaza Trygve Lie Plaza Sitting Area Reconstruction Completed June 2016
Tudor Grove Playground Mary O'Connor and Tudor Grove Playground Reconstruction Completed August 2023
Twenty-Four Sycamores Park Twenty-Four SycamoresPublic Restroom Building Reconstruction Completed July 2021
Various locations in Manhattan Manhattan Lower East Side Street Tree Planting and Community Greening FY22 Completed February 2024
Various locations in Manhattan Manhattan Park Tree Planting FY21 Completed February 2022
Various locations in Manhattan Manhattan Street Tree Planting FY17 Completed October 2018
Various locations in Manhattan Manhattan Street Tree Planting FY19 Completed June 2019
Various locations in Manhattan Manhattan Street Tree Planting FY20 - Community Board 2 Completed May 2021
Various locations in Manhattan Manhattan Street Tree Planting FY20 - Community Board 3 Completed May 2021
Various locations in Manhattan Manhattan Street Tree Planting FY20 - Community Board 4 Completed May 2021
Various locations in Manhattan Manhattan Street Tree Planting FY20 - Community Boards 1,3,5,6,8,11 Completed January 2021
Various locations in Manhattan Manhattan Street Tree Planting FY20 - Community Boards 2,4,7,9,10,12 Completed January 2021
Various locations in Manhattan Manhattan Street Tree Planting FY21 - Community Boards 2, 4, 7, 9, 10, 12 Completed February 2022
Various locations in Manhattan Manhattan Street Tree Planting FY21 - Community Boards 3, 5, 6, 8, 11 Completed February 2022
Various locations in Manhattan Manhattan Street Tree Planting FY22 - Council District 5 Completed June 2024
Various locations, Manhattan Manhattan Sandy-Related Tree Removal Completed June 2016
Various locations, Manhattan Manhattan Sandy-Related Tree Replacement Completed December 2015
Various locations, Manhattan Manhattan Street Tree Planting FY13 Completed January 2014
Various locations, Manhattan Manhattan Street Tree Planting FY14 Completed February 2015
Various locations, Manhattan Manhattan Street Tree Planting FY15 Completed March 2016
Various locations, Manhattan Manhattan Street Tree Planting FY16 Completed June 2017
Various locations, Manhattan Second Avenue Subway Street Tree Planting Restitution for Removed Trees Completed June 2016
Vietnam Veterans Plaza Vietnam Veterans Plaza Reconstruction (Hurricane Sandy) Completed July 2023
Wagner Houses Pool Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Wagner Playground Wagner Playground Synthetic Turf Reconstruction Completed January 2021
Wards Island Park Hell Gate Pathway Construction Phase 3 Completed December 2019
Wards Island Park Randall's Island Hell Gate Pathway Construction Completed August 2016
Wards Island Park Wards Island Park Synthetic Turf Maintenance Yard Curb Construction Completed June 2022
Washington Square Park Washington Square Park Perimeter Sidewalk Reconstruction Completed October 2016
White Playground White Playground Reconstruction Completed June 2016
William B. Washington Memorial Garden Manhattan Community Garden Water Service Installation Completed June 2021
William F. Passannante Ballfield William F. Passannante Ballfield Reconstruction Completed October 2023
Wright Brothers Playground Manhattan Roofing Systems Reconstruction (MG-709M) Completed August 2015

Queens Projects

Location Project Phase Completion Date
135-21 241st Street PS 38 Playground Reconstruction Completed January 2014
A.R.R.O.W. Field House Arrow Recreation Center Playground Reconstruction Completed March 2018
Al Stabile Playground Al Stabile Playground Reconstruction Completed July 2023
Alley Athletic Playground Queens General Site Work (QG-1316M) Completed December 2019
Alley Athletic Playground Queens General Site Work (QG-613M) Completed November 2016
Alley Athletic Playground Queens General Site Work (QG-711M) Completed August 2013
Alley Pond Park Queens General Site Work (QG-1316M) Completed December 2019
Alley Pond Park Alley Pond Environmental Center Reconstruction Completed September 2023
Alley Pond Park Alley Pond Park Living Shoreline Construction Phase 1 Completed March 2021
Alley Pond Park Alley Pond Park Paths and Drainage Reconstruction Completed August 2015
Alley Pond Park Alley Pond Park Telecommunication Lines Reconstruction Completed October 2022
Alley Pond Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Alley Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Alley Pond Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Alley Pond Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Alley Pond Park Queens General Site Work (QG-713MA) Completed November 2016
Almeda Playground Almeda Playground Reconstruction Completed October 2020
Annadale Playground Queens General Site Work (QG-1011M) Completed July 2014
Archie Spigner Park Queens General Site Work (QG-614MA) Completed May 2017
Astoria Health Playground Astoria Health Playground Reconstruction Completed March 2019
Astoria Heights Playground Queens General Site Work (QG-1011M) Completed July 2014
Astoria Heights Playground Astoria Heights and Bowne Playground Public Restroom Building Reconstruction Completed July 2018
Astoria Heights Playground Astoria Heights-JHS10 Playground Reconstruction Completed May 2018
Astoria Park Citywide Pool Structural Systems Reconstruction (CNYG-1011M) Completed June 2017
Astoria Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Astoria Park Astoria Park Charybdis Playground Public Restroom Building Reconstruction Completed November 2021
Astoria Park Astoria Park Charybdis Playground Reconstruction and Spray Shower Construction Completed July 2021
Astoria Park Astoria Park Diving Pool Plaza Construction Completed November 2019
Astoria Park Astoria Park Field House Restrooms Reconstruction Completed December 2021
Astoria Park Astoria Park Field House Roof Reconstruction Completed November 2021
Astoria Park Astoria Park Track and Field Reconstruction Completed October 2019
Astoria Park Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Astoria Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Astoria Park Queens East River and North Shore Greenway Construction Completed September 2013
Athens Square Athens Square Playground Plaza Reconstruction Completed August 2014
Baisley Pond Park Baisley Pond Park Pathway Reconstruction Completed May 2016
Bay Terrace Playground Bay Terrace Playground Reconstruction Completed June 2023
Bayside Playground Bayside Playground Public Restroom Building Reconstruction Completed March 2024
Bayswater Park Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction Completed November 2018
Beach 59th St Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Beach 59th St Playground Beach 59th Street Playground Reconstruction Completed March 2023
Beach Channel Playground Beach Channel (P.S. 183) Playground Reconstruction (Q403-111M) Completed March 2014
Bellerose Playground Bellerose Playground Reading Garden Construction Completed April 2024
Big Bush Playground Big Bush Park Playground Reconstruction Completed May 2018
Big Bush Playground Big Bush Playground Synthetic Turf Field Reconstruction Completed August 2023
Bowne Park Bowne Park Bocce Court Construction Completed August 2013
Bowne Park Bowne Park Playground Reconstruction Completed August 2017
Bowne Park Bowne Park Plaza Reconstruction Completed January 2023
Bowne Park Bowne Park Pond Reconstruction Completed February 2023
Bowne Park Queens General Public Restroom Building and Facility Reconstruction (QG-1413MA) Completed June 2018
Bowne Playground Astoria Heights and Bowne Playground Public Restroom Building Reconstruction Completed July 2018
Bowne Playground Bowne Playground Reconstruction Completed April 2019
Briarwood Playground Briarwood Playground and Phil 'Scooter' Rizzuto Park Playground Reconstruction Completed March 2020
Brinkerhoff Mall Queens General Site Work (QG-1216M) Completed November 2018
Broad Channel Park Queens General Site Work (QG-1216M) Completed November 2018
Broad Channel Park Broad Channel Park Reconstruction Completed June 2022
Brookville Park Queens General Site Work (QG-613M) Completed November 2016
Brookville Park Brookville Park Entrance Reconstruction Completed October 2020
Brookville Park Brookville Park Picnic Area Reconstruction and Tennis Courts Construction Completed July 2018
Brookville Park Brookville Park Synthetic Turf Field Reconstruction Completed June 2022
Brookville Park Queens General Site Work (QG-1116M) Completed December 2018
Cambria Playground Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Cambria Playground Queens Adult Fitness Equipment Construction (QG-618M) Completed March 2020
Captain Dermody Triangle Captain Dermody Triangle Reconstruction Completed July 2023
Captain Tilly Park Captain Tilly Park Landscape and Drainage Reconstruction Completed November 2015
Captain Tilly Park Captain Tilly Park Plaza Reconstruction Completed October 2017
Captain Tilly Park Captain Tilly Park Public Restroom Building Reconstruction Completed June 2024
Castlewood Playground Castlewood Playground Multipurpose Play Area Reconstruction Completed November 2022
Challenge Playground Challenge Playground Reconstruction Completed May 2022
Chappetto Square Chappetto Square Reconstruction Completed August 2020
College Point Fields College Point Fields Sports and Security Lighting Construction Completed May 2024
College Point Fields College Point Fields Sports Complex Construction Completed August 2022
College Point Fields Queens Roller Hockey Rinks Reconstruction Completed November 2018
College Point Park Queens General Site Work (QG-1813M) Completed January 2016
Conch Playground Conch Playground Reconstruction Completed January 2018
Corona Golf Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Corona Golf Playground Corona Golf Playground Pavement Reconstruction Completed May 2020
Corona Golf Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Crocheron Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Crocheron Park Crocheron Park Little League Ballfields Reconstruction Completed July 2020
Cross Island Parkway Alley Pond Park Living Shoreline Construction Phase 2 Completed June 2023
Cross Island Parkway Bayside Marina Electrical Systems Reconstruction (Hurricane Sandy) Completed May 2019
Cross Island Parkway Joe Michael's Mile Reconstruction Completed August 2018
Crosson Park Queens General Site Work (QG-1011M) Completed July 2014
Crowley Playground Queens General Site Work (QG-1313M) Completed February 2018
Cunningham Park Queens General Site Work (QG-711M) Completed August 2013
Cunningham Park Queens General Site Work (QG-1216M) Completed November 2018
Cunningham Park Cunningham Park Ballfields 2-4 Reconstruction Completed July 2013
Cunningham Park Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction Completed December 2023
Cunningham Park Cunningham Park Lower Redwood Playground Tot Lot Reconstruction Completed April 2020
Cunningham Park Cunningham Park Picnic Area Reconstruction and Performance Area Construction Completed September 2018
Cunningham Park Cunningham Park Redwood Playground Public Restroom Building Sewer Line Reconstruction Completed November 2021
Cunningham Park Cunningham Park Redwood Upper Playground Reconstruction Completed October 2023
Cunningham Park Queens General Site Work (QG-413M) Completed July 2017
Cunningham Park Vanderbilt Motor Parkway Reconstruction Phase 2 Completed April 2023
Daniel M. O'Connell Playground O'Connell Playground Recreation Building Reconstruction Completed April 2019
Detective Keith L Williams Park Detective Keith L. Williams Park Basketball Courts Reconstruction Completed October 2023
Detective Keith L Williams Park Liberty Pool Deck Reconstruction Completed May 2022
Detective Keith L Williams Park Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1) Completed September 2018
Detective Keith L Williams Park Queens General Site Work (QG-513M) Completed February 2016
Doughboy Park Doughboy Plaza Seating Area Reconstruction Completed September 2021
Douglaston Park Golf Course Douglaston Golf Course Net Barrier Installation Completed July 2014
Dunningham Triangle Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction Completed June 2016
Dutch Kills Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Dutch Kills Playground Dutch Kills Playground and Court Area Reconstruction Completed May 2019
Dutch Kills Playground Dutch Kills Playground Ballfield Lighting Reconstruction Completed May 2024
Dutch Kills Playground Dutch Kills Playground Public Restroom Building Reconstruction Completed December 2019
East River and 44th Drive 44th Drive Pier Reconstruction Completed August 2016
Ehrenreich-Austin Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Public Restroom Building Electrical System Reconstruction Completed January 2019
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Public Restroom Building Plumbing System Reconstruction Completed January 2019
Ehrenreich-Austin Playground Ehrenreich-Austin Playground Public Restroom Building Reconstruction Completed January 2019
Electric Playground Queens Green Infrastructure Construction (QG-518M) Completed September 2024
Elmhurst Park Queens General Site Work (QG-613M) Completed November 2016
Elmhurst Park Elmhurst Park Vietnam Veterans Memorial Construction Completed December 2019
Emerald Playground Emerald Playground Public Restroom Building Roof Reconstruction Completed March 2022
Evergreen Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Evergreen Park Evergreen Park Playground and Spray Shower Reconstruction Completed June 2016
Evergreen Park Evergreen Park Playground Reconstruction Completed January 2019
Fisher Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Fisher Pool Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Flushing Fields Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Flushing Fields Memorial Field of Flushing Ballfield Reconstruction Completed October 2013
Flushing Meadows Corona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Flushing Meadows Corona Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Flushing Meadows Corona Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Flushing Meadows Corona Park Queens General Site Work (QG-1011M) Completed July 2014
Flushing Meadows Corona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Flushing Meadows Corona Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Flushing Meadows Corona Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M) Completed April 2018
Flushing Meadows Corona Park Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Flushing Meadows Corona Park Flushing Meadows Corona Park Adult Fitness Equipment Installation Completed July 2022
Flushing Meadows Corona Park Flushing Meadows Corona Park Aquatic Center Emergency Netting System Installation Completed July 2021
Flushing Meadows Corona Park Flushing Meadows Corona Park Aquatic Center Pool Floor Reconstruction Completed February 2023
Flushing Meadows Corona Park Flushing Meadows Corona Park Fields 2,3,5 Reconstruction Completed July 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Fountain of the Fairs Reconstruction Completed October 2020
Flushing Meadows Corona Park Flushing Meadows Corona Park Garage Reconstruction Completed May 2022
Flushing Meadows Corona Park Flushing Meadows Corona Park Henry Hudson Entrance Reconstruction Completed July 2020
Flushing Meadows Corona Park Flushing Meadows Corona Park Lawrence Playground Public Restroom Building Reconstruction Completed May 2021
Flushing Meadows Corona Park Flushing Meadows Corona Park Lawrence Playground Reconstruction Completed May 2019
Flushing Meadows Corona Park Flushing Meadows Corona Park Mauro Playground Reconstruction Completed November 2019
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Habitat Restoration Completed May 2016
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction Completed May 2024
Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Promenade Reconstruction Completed April 2019
Flushing Meadows Corona Park Flushing Meadows Corona Park Pavement and Fence Reconstruction Completed September 2013
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Emergency Roof Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Pool Locker Room Reconstruction Completed October 2017
Flushing Meadows Corona Park Flushing Meadows Corona Park Retired Animals Garden Installation Completed August 2023
Flushing Meadows Corona Park Flushing Meadows Corona Park Roosevelt Avenue Entrance Reconstruction Completed June 2018
Flushing Meadows Corona Park Flushing Meadows Corona Park Synthetic Turf Field 1 Reconstruction Completed July 2015
Flushing Meadows Corona Park Flushing Meadows Corona Park Synthetic Turf Fields 8 & 9 Reconstruction Completed September 2024
Flushing Meadows Corona Park Olmsted Center Reconstruction Completed January 2022
Flushing Meadows Corona Park Queens General Site Work (QG-212M) Completed October 2016
Flushing Meadows Corona Park World's Fair Playground Asphalt Field Reconstruction Completed June 2019
Forest Park Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Forest Park Queens General Site Work (QG-613M) Completed November 2016
Forest Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Forest Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Forest Park Queens General Site Work (QG-1216M) Completed November 2018
Forest Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Forest Park Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Forest Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Forest Park Forest Park Garage and Oak Ridge Roof Reconstruction Completed August 2021
Forest Park Forest Park Glendale Entrance Construction Completed June 2022
Forest Park Forest Park LIRR Towers Removal Completed October 2021
Forest Park Forest Park Pathways Reconstruction Completed July 2022
Forest Park Forest Park Sobelsohn Playground Public Restroom Building Electrical System Reconstruction Completed September 2020
Forest Park Forest Park Sobelsohn Playground Public Restroom Building Plumbing System Reconstruction Completed September 2020
Forest Park Forest Park Sobelsohn Playground Public Restroom Building Reconstruction Completed September 2020
Forest Park Forest Park T-Ball Field and The Overlook Drainage System Reconstruction Completed June 2016
Forest Park Joe Devoy Playground Reconstruction Completed January 2017
Forest Park Mary Whalen Playground Reconstruction Completed May 2016
Forest Park Oakridge Turn/Forest Park Drive Reconstruction Completed September 2017
Forest Park Queens General Site Work (QG-217M) Completed July 2021
Forest Park Queens General Site Work (QG-915M) Completed November 2016
Forest Park Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction Completed October 2020
Fort Totten Park Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Fort Totten Park Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Fort Totten Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Fort Totten Park Queens General Site Work (QG-713MA) Completed November 2016
Fort Totten Park Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Fort Totten Park Citywide Intermediate Pool Filter Plants Reconstruction Completed April 2023
Fort Totten Park Queens General Site Work (QG-915M) Completed November 2016
Fort Totten Park Bayside Historical Society Officers Club Porch Reconstruction Completed March 2019
Fort Totten Park Bronx, Manhattan and Queens Reforestation FY15 Completed October 2017
Fort Totten Park Fort Totten Park Building 429 Roof Reconstruction Completed February 2017
Fort Totten Park Fort Totten Park Chapel and Commander's House Reconstruction Completed March 2021
Fort Totten Park Fort Totten Park Seawall Reconstruction Completed August 2014
Fort Totten Park Fort Totten Park Telecommunication Lines Reconstruction Completed August 2019
Fort Totten Park Fort Totten Pool Main Drain Reconstruction Completed June 2022
Francis Lewis Park Francis Lewis Park Plaza Reconstruction Completed January 2023
Frank D. O'Connor Playground Queens General Site Work (QG-1313M) Completed February 2018
Frank Golden Park Frank Golden Park Fields Reconstruction Phase II Completed August 2021
Frank Principe Park Frank Principe Park Ballfields Reconstruction Completed November 2018
Frederick B. Judge Playground Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Frederick B. Judge Playground Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1) Completed September 2018
Frederick B. Judge Playground Frederick B. Judge Playground Basketball Courts Reconstruction Completed May 2016
Freedom Square Playground Queens General Site Work (QG-1011M) Completed July 2014
Frontera Park Queens General Site Work (QG-413M) Completed July 2017
General Hart Playground General Hart Playground Public Restroom Reconstruction Completed January 2023
General Hart Playground General Hart Playground Reconstruction Completed November 2020
Glen Oaks Oval Glen Oaks Oval Playground Reconstruction and Adult Fitness Equipment Construction Completed April 2021
Gorman Playground Gorman Playground Reconstruction Completed November 2023
Grassmere Playground Grassmere Playground Reconstruction Completed November 2017
Grover Cleveland Playground Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction Completed November 2020
Haggerty Park Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Haggerty Park Queens Adult Fitness Equipment Construction (QG-618M) Completed March 2020
Hallets Cove Playground Queens East River and North Shore Greenway Construction Completed September 2013
Hallets Cove Playground Hallets Cove Playground Handball Court Reconstruction Completed October 2023
Hallets Cove Playground Hallets Cove Playground Multi Purpose Play Area Reconstruction Completed February 2023
Hallets Cove Playground Hallets Cove Playground Reconstruction Completed December 2019
Hallets Cove Playground Hallets Cove Seawall Reconstruction Completed September 2022
Hammel Playground Citywide Electrical Systems Reconstruction (CNYG-907M) Completed October 2014
Hammel Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Hammel Playground Citywide Buildings Reconstruction (CNYG-209M) Completed February 2015
Harvard Playground Queens Athletic Courts Reconstruction (QG-216M) Completed July 2019
Harvey Park Queens Roller Hockey Rinks Reconstruction Completed November 2018
Harvey Park Queens General Site Work (QG-217M) Completed July 2021
Helen Marshall Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Helen Marshall Playground Queens Green Infrastructure Construction (QG-518M) Completed September 2024
Helen Marshall Playground Helen Marshall Playground Reconstruction Completed January 2020
Helen Marshall Playground Queens General Public Restroom Building and Facility Reconstruction (QG-1613MA) Completed June 2018
Hempstead Bench Spread Queens General Site Work (QG-811M) Completed September 2013
Hermon A. MacNeil Park Queens General Site Work (QG-513M) Completed February 2016
Hermon A. MacNeil Park Queens General Site Work (QG-915M) Completed November 2016
Hermon A. MacNeil Park Queens General Site Work (QG-811M) Completed September 2013
Hermon A. MacNeil Park MacNeil Park Entrances Reconstruction Completed April 2024
Hermon A. MacNeil Park MacNeil Park Esplanade Reconstruction Completed May 2019
Highland Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Highland Park Queens General Site Work (QG-613M) Completed November 2016
Highland Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Highland Park Citywide Energy Efficient Ballfield Lighting Retrofits (CNYG-2915M) Completed September 2020
Highland Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Highland Park Highland Park Ballfields 1 & 2 Reconstruction Completed May 2016
Highland Park Highland Park Basketball Courts Reconstruction Completed February 2019
Highland Park Highland Park Lower East Playground Public Restroom Building Reconstruction Completed May 2023
Highland Park Highland Park Lower East Playground Reconstruction Completed February 2022
Highland Park Highland Park Lower Western Playground Reconstruction Completed September 2020
Highland Park Highland Park Pedestrian Paths and Sidewalks Reconstruction Completed August 2021
Highland Park Highland Park Perimeter Pathways, Fencing and Security Lighting Reconstruction Completed September 2013
Highland Park Highland Park Ridgewood Reservoir Gatehouse 27 Reconstruction Completed May 2024
Highland Park Highland Park Stone Bridge Overlook Area Reconstruction Completed June 2023
Highland Park Queens General Site Work (QG-913M) Completed July 2015
Highland Park Upper Highland Park Playground Public Restroom Building Sewer Reconstruction Completed December 2022
Hinton Park Hinton Park Reconstruction Completed July 2016
Hoffman Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Holy Cow Playground Queens General Site Work (QG-913M) Completed July 2015
Hook Creek Park Hook Creek Park Sediment Application Completed February 2023
Horace Harding Playground Queens Green Infrastructure Construction (QG-518M) Completed September 2024
Howard Von Dohlen Playground Von Dohlen Playground Adult Fitness and Skate Area Construction and Ballfield Reconstruction Completed April 2016
Hoyt Playground Queens General Site Work (QG-514MA) Completed April 2017
Idlewild Park Idlewild Park Fencing, Sidewalks and Parking Lot Reconstruction Completed May 2024
Idlewild Park Idlewild Park Forest Restoration and Tree Planting Completed December 2018
Idlewild Park Idlewild Park Nature Center Construction Completed August 2021
Jamaica Playground Jamaica Playground Reconstruction Completed June 2023
James A. Bland Playground James A. Bland Playground Reconstruction Completed June 2024
Joseph Austin Playground Joseph Austin Playground Synthetic Turf Field Reconstruction Completed June 2018
Judge Moses Weinstein Playground Queens General Site Work (QG-713MA) Completed November 2016
Judge Moses Weinstein Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Junction Playground Junction and Corona Golf Playground Play Equipment Installation (QG-615M) Completed April 2017
Juniper Valley Park Queens Roller Hockey Rinks Reconstruction Completed November 2018
Juniper Valley Park Juniper Valley Park Bocce Court Construction Completed September 2014
Juniper Valley Park Juniper Valley Park Spray Shower Reconstruction Completed October 2019
Juniper Valley Park Juniper Valley Park Track and Field Reconstruction Completed November 2022
Juniper Valley Park Juniper Valley Park Water Service Installation Completed September 2022
Kissena Corridor Park Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M) Completed April 2019
Kissena Corridor Park Queens General Site Work (QG-1316M) Completed December 2019
Kissena Corridor Park Vanderbilt Motor Parkway Reconstruction Phase 2 Completed April 2023
Kissena Corridor Park Kissena Corridor Park and Hutchinson River Parkway Path Lighting Construction Completed April 2023
Kissena Corridor Park Kissena Corridor Park Path Construction Completed July 2018
Kissena Corridor Park Kissena Corridor Park Rachel Carson Playground Synthetic Turf Field Reconstruction Completed October 2022
Kissena Corridor Park Silent Spring Playground Reconstruction Completed December 2018
Kissena Park Citywide Steel Guiderails, Timber Rails and Fencing Installation (CNYG-1414M) Completed October 2018
Kissena Park Queens General Public Restroom Building and Facility Reconstruction (QG-1613MA) Completed June 2018
Kissena Park Queens General Site Work (QG-811M) Completed September 2013
L/CPL Thomas P. Noonan Jr. Playground Queens General Site Work (QG-513M) Completed February 2016
L/CPL Thomas P. Noonan Jr. Playground Noonan Playground Dog Run Construction and Seating Area Reconstruction Completed March 2024
L/CPL Thomas P. Noonan Jr. Playground Noonan Playground Spray Shower and Playground Reconstruction Completed March 2015
Lanett Playground Lanett Playground Reconstruction and Public Restroom Building Construction Completed April 2014
Lanett Playground Lanett Playground Sitting Area Reconstruction Completed September 2021
Laurelton Parkway Laurelton West Playground Reconstruction Completed June 2014
Laurelton Playground Laurelton Playground and Bayswater Park Skate Elements and Seating Areas Construction Completed November 2018
Lawrence Virgilio Playground Queens General Site Work (QG-413M) Completed July 2017
Legacy Park NYCHA Pomonok Houses Open Space Construction Completed June 2022
Little Bay Park Queens General Site Work (QG-1116M) Completed December 2018
Little Bay Park Little Bay Park Soccer Fields Reconstruction Completed May 2017
Little Bay Park Little Bay Parking Lot Reconstruction and Public Restroom Building Construction Completed January 2016
Locust Grove Civic Triangle Queens General Site Work (QG-811M) Completed September 2013
London Planetree Playground Queens Green Infrastructure Construction (QG-518M) Completed September 2024
Lost Battalion Hall Recreation Center Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Lost Battalion Hall Recreation Center Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Lost Battalion Hall Recreation Center Brooklyn and Queens Recreation and Nature Centers HVAC Systems Reconstruction (CNYG-1910MA1) Completed October 2018
Louis Armstrong Community Center Louis Armstrong Center HVAC Center Reconstruction Completed August 2013
Louis Armstrong Playground Citywide Plumbing Systems Reconstruction (CNYG-1007M) Completed April 2014
Louis C. Moser Playground Louis C. Moser Park Playground Reconstruction Completed September 2018
Lt. Clinton L .Whiting Square Queens General Site Work (QG-217M) Completed July 2021
Mafera Park Queens Roller Hockey Rinks Reconstruction Completed November 2018
Mafera Park Mafera Park Ballfield Lighting Reconstruction Completed December 2023
Maple Playground Maple Playground Reconstruction Completed September 2023
Marconi Park Marconi Park Playground Reconstruction Completed June 2016
Margaret I. Carman Green - Weeping Beech Bowne House Restoration Completed November 2014
Maurice A FitzGerald Playground Maurice A. Fitzgerald Playground Ballfield Lighting Reconstruction Completed December 2023
Montbellier Park Queens Adult Fitness Equipment Construction (QG-618M) Completed March 2020
Moore Homestead Playground Clement Clarke Moore Homestead Playground Reconstruction Completed October 2020
Motor Parkway Vanderbilt Motor Parkway Reconstruction Phase 2 Completed April 2023
Motor Parkway from Winchester Boulevard to Springfield Boulevard Vanderbilt Motor Parkway Reconstruction Phase 1 Completed September 2021
Murray Playground Murray Playground Dog Run and Sitting Area Reconstruction Completed June 2014
Nameoke Park Nameoke Park Construction Completed September 2023
Nathan Weidenbaum Playground Little Bush Park Playground Reconstruction Completed September 2021
Newtown Playground Newtown Playground Reconstruction Completed September 2019
Norelli-Hargreaves Playground Norelli Hargreaves Playground Basketball Courts and Multi-Purpose Play Area Reconstruction Completed August 2020
Norelli-Hargreaves Playground Norelli-Hargreaves Playground Reconstruction Completed September 2019
Northern Playground Northern Playground Synthetic Turf Reconstruction Completed September 2021
One Room Schoolhouse Park Queens General Site Work (QG-1316M) Completed December 2019
Overlook Park Overlook Park Seating Area Reconstruction Completed September 2019
Park Queens General Site Work (QG-514MA) Completed April 2017
Park Of The Americas Park of the Americas Adult Fitness Area Reconstruction Completed December 2022
Park Of The Americas Park of the Americas Synthetic Turf and Playground Reconstruction Completed July 2020
Park at Beach 108 Street Beach 108 - Beach Channel Drive Sidewalk Reconstruction Completed April 2017
Park at Beach 108 Street Beach 108th Street Esplanade Reconstruction Completed September 2023
Pat Williams Playground Queens General Site Work (QG-614MA) Completed May 2017
Paul Raimonda Playground Raimonda Playground Reconstruction Completed May 2016
Plaut Triangle Queens General Site Work (QG-1813M) Completed January 2016
Playground Ninety Dunningham Triangle and Playground Ninety Basketball Court and Spray Shower Reconstruction Completed June 2016
Playground Thirty Five XXXV Playground Thirty Five XXXV Reconstruction Completed December 2019
Police Officer Edward Byrne Park Police Officer Edward Byrne Park Basketball and Tennis Courts Reconstruction Completed May 2023
Police Officer Nicholas Demutiis Park Queens General Site Work (QG-713MA) Completed November 2016
Police Officer Nicholas Demutiis Park Police Officer Nicholas Demutiis Park Playground Reconstruction Completed August 2017
Poppenhusen Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA) Completed October 2018
Queens Village Veterans Plaza Queens General Site Work (QG-1011M) Completed July 2014
Queensbridge Park Queens East River and North Shore Greenway Construction Completed September 2013
Queensbridge Park Queensbridge Baby Park Handball Courts Reconstruction Completed February 2023
Queensbridge Park Queensbridge Park Field House Construction Completed March 2020
Rainey Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rainey Park Queens East River and North Shore Greenway Construction Completed September 2013
Ralph Demarco Park Queens East River and North Shore Greenway Construction Completed September 2013
Ravenswood Playground Ravenswood Playground Reconstruction Completed June 2022
Raymond O’Connor Park Kennedy Playground Raymond O'Connor Field Synthetic Turf Reconstruction Completed October 2023
Real Good Playground Queens General Site Work (QG-1313M) Completed February 2018
Redfern Playground Redfern Playground Reconstruction Completed February 2023
Reiff Playground Queens General Site Work (QG-1011M) Completed July 2014
Reiff Playground Queens General Public Restroom Building and Facility Reconstruction (QG-1513MA1) Completed September 2018
Rochdale Park Bronx and Queens Roofing Systems Reconstruction (CNYG-3009M) Completed June 2015
Rochdale Park Vic Hanson Field House Telecommunication Lines Reconstruction Completed March 2022
Rockaway Beach Rockaway Beach Lifeguard Trailer Furnishing and Installation Completed June 2017
Rockaway Beach Boardwalk Queens General Site Work (QG-711M) Completed August 2013
Rockaway Beach Boardwalk Rockaway Beach Shore Front Parkway Handball Courts Reconstruction Completed March 2020
Rockaway Beach Boardwalk Rockaway Beach Skate Park Reconstruction Completed October 2020
Rockaway Beach Boardwalk Sandpiper Playground Reconstruction Completed October 2019
Rockaway Beach Boardwalk Shore Front Parkway Adventure Course Construction Completed April 2022
Rockaway Beach Boardwalk Shore Front Parkway Beach 98th Playground Construction Completed November 2023
Rockaway Beach Boardwalk Shore Front Parkway Dog Run Construction Completed May 2022
Rockaway Beach Boardwalk Shore Front Parkway Gateway Structure Construction Completed November 2022
Rockaway Beach Boardwalk Shore Front Parkway Labyrinth and Seating Area Construction Completed March 2023
Rockaway Beach Boardwalk Shore Front Parkway Multi-Purpose Area Construction Completed May 2023
Rockaway Beach and Boardwalk Beach 24th and 25th Streets Ramps Construction Completed February 2024
Rockaway Beach and Boardwalk Rockaway Beach Emergency Protective Measures (Hurricane Sandy) Completed November 2013
Rockaway Community Park Queens General Site Work (QG-915M) Completed November 2016
Rockaway Freeway Queens General Site Work (QG-915M) Completed November 2016
Rory Staunton Field Travers Park and Staunton Field Reconstruction Completed August 2019
Rosemary's Playground Rosemary's Playground Reconstruction Completed February 2020
Roy Wilkins Recreation Center Queens General Site Work (QG-711M) Completed August 2013
Roy Wilkins Recreation Center Queens General Site Work (QG-614MA) Completed May 2017
Roy Wilkins Recreation Center Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Roy Wilkins Recreation Center Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Roy Wilkins Recreation Center Queens General Site Work (QG-212M) Completed October 2016
Roy Wilkins Recreation Center Nautilus Playground Reconstruction Completed August 2023
Roy Wilkins Recreation Center Roy Wilkins Park Black Spectrum Theatre Pathways and Lawn Reconstruction Completed December 2022
Roy Wilkins Recreation Center Roy Wilkins Park Performance Area Reconstruction Completed May 2019
Roy Wilkins Recreation Center Roy Wilkins Park Track and Field Reconstruction Completed November 2018
Roy Wilkins Recreation Center Roy Wilkins Recreation Center Gymnasium Reconstruction Completed March 2022
Roy Wilkins Recreation Center Roy Wilkins Recreation Center Kitchen and Roof Reconstruction Completed August 2019
Rufus King Park Queens General Site Work (QG-613M) Completed November 2016
Rufus King Park King Manor Museum Telecommunication Lines Reconstruction Completed August 2022
Rufus King Park Rufus King Park Entrance Construction and Fence Reconstruction Completed May 2021
Rufus King Park Rufus King Park Gazebo Reconstruction Completed November 2016
Ruoff Triangle Ruoff Triangle Reconstruction Completed September 2017
Saul Weprin Playground Saul Weprin Playground Plaza Reconstruction Completed December 2019
Sean's Place Sean's Place Reconstruction Completed September 2017
Simeone Park Louis Simeone Park Reconstruction Completed January 2018
Sohncke Square Sohncke Square Reconstruction Completed July 2024
Sorrentino Recreation Center Sorrentino Recreation Center Boiler Reconstruction and HVAC Construction Completed December 2018
Sorrentino Recreation Center Sorrentino Recreation Center Reconstruction Completed March 2019
South Rochdale Playground Queens General Site Work (QG-811M) Completed September 2013
Sparrow's Nest Community Garden Queens General Site Work (QG-513M) Completed February 2016
Spring Creek Park Addition Spring Creek Greenstreets and Green Infrastructure Construction Completed November 2020
Springfield Park Queens General Public Restroom Building and Facility Reconstruction (QG-1413MA) Completed June 2018
Springfield Park Queens General Site Work (QG-1116M) Completed December 2018
Springfield Park Springfield Park Basketball Courts and BBQ Area Reconstruction Completed July 2023
Springfield Park North Queens General Public Restroom Building and Facility Reconstruction (QG-1413MA) Completed June 2018
St. Michael's Playground St. Michael's Playground Ballfield Lighting Reconstruction Completed December 2023
St. Michael's Playground St. Michael's Playground Synthetic Turf Field Reconstruction Completed June 2024
Starr Playground Starr Playground Multi-Purpose Play Area and Handball Courts Reconstruction Completed May 2022
Starr Playground Starr Playground Play Area and Spray Shower Reconstruction Completed August 2023
Sunset Cove Park Sunset Cove Park Boardwalk and Outdoor Classroom Construction Completed August 2023
Sunset Cove Park Sunset Cove Park Saltwater Marsh and Coastal Upland Construction Completed June 2019
The Olde Towne of Flushing Burial Ground Olde Towne of Flushing Burial Ground Monument Construction Completed August 2021
Travers Park Travers Park and Staunton Field Reconstruction Completed August 2019
Travers Park Travers Park Tot Lot Reconstruction Completed October 2020
Triborough Bridge Playground A Hoyt Ave between 21st and Astoria Park. Queens General Site Work (QG-514MA) Completed April 2017
Triborough Bridge Playground C Triborough Bridge Playground C Reconstruction Completed March 2019
Tribute Park Tribute Park Reconstruction (Hurricane Sandy) Completed December 2019
Tudor Park Queens Green Infrastructure Construction (QG-518M) Completed September 2024
Tudor Park Grover Cleveland Playground and Pals Oval Synthetic Turf Fields Reconstruction Completed November 2020
Two Coves Community Garden Goodwill Park Common Green Plaza Construction Completed December 2013
Underbridge Dog Run Underbridge Dog Run and Forest Park Overlook Dog Run Fencing Reconstruction Completed October 2020
Utopia Playground Austin, Giovanelli, and Utopia Playgrounds Reconstruction Completed December 2017
Van Alst Playground Van Alst Playground Reconstruction Completed June 2017
Various Locations, Queens Queens Street Tree Planting FY13 - Community Boards 10,12-14 Completed August 2014
Various locations Queens Street Tree Planting FY23 - Community Board 7 (QG-1019MR) Completed July 2023
Various locations in Queens Queens Emerald Ash Borer (EAB) Related Tree Removal Completed March 2023
Various locations in Queens Queens Green Infrastructure Construction (QG-813M) Completed September 2016
Various locations in Queens Queens Park Tree Planting FY22 Completed June 2024
Various locations in Queens Queens PlaNYC Street Tree Planting FY18 - Community Boards 7,8,11 Completed September 2020
Various locations in Queens Queens Site Preparation FY22 - Council District 30 Completed February 2023
Various locations in Queens Queens Street Tree Planting FY16 - Community Boards 1-6 Completed May 2017
Various locations in Queens Queens Street Tree Planting FY16 - Community Boards 7,8,11,12 Completed May 2017
Various locations in Queens Queens Street Tree Planting FY16 - Community Boards 9,10,13,14 Completed April 2017
Various locations in Queens Queens Street Tree Planting FY17 - Community Boards 1-5 Completed June 2018
Various locations in Queens Queens Street Tree Planting FY17 - Community Boards 12,13,14 Completed June 2018
Various locations in Queens Queens Street Tree Planting FY17 - Community Boards 6,9,10 Completed June 2018
Various locations in Queens Queens Street Tree Planting FY17 - Community Boards 7,8,11 Completed September 2018
Various locations in Queens Queens Street Tree Planting FY19 - Community Boards 1-5 Completed June 2019
Various locations in Queens Queens Street Tree Planting FY19 - Community Boards 6,9,10 Completed January 2020
Various locations in Queens Queens Street Tree Planting FY20 - Community Boards 12,13 Completed June 2021
Various locations in Queens Queens Street Tree Planting FY20 - Community Boards 7,8,11 Completed February 2023
Various locations in Queens Queens Street Tree Planting FY20 - Community Boards 9,10,14 Completed April 2021
Various locations in Queens Queens Street Tree Planting FY21 - Community Board 10 Completed November 2022
Various locations in Queens Queens Street Tree Planting FY21 - Community Board 7 (QG-1019M) Completed May 2022
Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 1-3 Completed March 2022
Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 1-6 Completed February 2023
Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 12-13 Completed June 2022
Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 4-6 Completed January 2022
Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 9, 14 Completed January 2023
Various locations in Queens Queens Street Tree Planting FY22 - Community Boards 1-4 Completed June 2023
Various locations in Queens Queens Street Tree Planting FY22 - Community Boards 9-10, 14 Completed February 2024
Various locations in Queens Queens Street Tree Planting FY22 - Council District 30 Completed June 2023
Various locations in Queens Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 1-7,9,10 Completed June 2021
Various locations in Queens Queens Tree-Damaged Sidewalk Reconstruction FY19 - Community Boards 8,11-14 Completed January 2021
Various locations in Queens Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 1-7, 9-10 Completed February 2023
Various locations in Queens Queens Tree-Damaged Sidewalk Reconstruction FY21 - Community Boards 8, 11-14 Completed September 2022
Various locations, Queens Flushing Meadows Corona Park Street Tree Planting Restitution for USTA Construction Completed July 2015
Various locations, Queens Queens Sandy-Related Tree Removal - Community Boards 1-5 Completed August 2015
Various locations, Queens Queens Sandy-Related Tree Removal - Community Boards 6-14 Completed July 2015
Various locations, Queens Queens Sandy-Related Tree Replacement Completed March 2016
Various locations, Queens Queens Street Tree Planting FY13 - Community Boards 1-8 Completed March 2014
Various locations, Queens Queens Street Tree Planting FY14 - Community Boards 1-6 Completed March 2015
Various locations, Queens Queens Street Tree Planting FY14 - Community Boards 10,12-14 Completed February 2015
Various locations, Queens Queens Street Tree Planting FY14 - Community Boards 7-9,11 Completed May 2015
Various locations, Queens Queens Street Tree Planting FY15 - Community Boards 1-6 Completed April 2016
Various locations, Queens Queens Street Tree Planting FY15 - Community Boards 7,8,11,12 Completed April 2016
Various locations, Queens Queens Street Tree Planting FY15 - Community Boards 9,10,13,14 Completed October 2016
Various locations, Queens NE Queens Tree-Damaged Sidewalk Reconstruction Community Boards 7,8,11 (QG-1423MR) Completed June 2023
Various locations, Queens West Queens Tree-Damaged Sidewalk Reconstruction Community Boards 1-6,9,10 (QG-1223MR) Completed November 2023
Veterans Grove Veterans Grove Reconstruction Completed February 2017
Walter Ward Playground Nautilus, Walter Ward, and Cambria Playgrounds Basketball and Handball Courts Reconstruction Completed March 2017
Whitestone Playground Queens General Site Work (QG-1011M) Completed July 2014
Whitey Ford Field Citywide Ballfield Lighting Installation (CNYG-2815M) Completed July 2018
Whitey Ford Field Whitey Ford Field Reconstruction Completed June 2022
William Simmons Community Garden Club Queens General Site Work (QG-1116M) Completed December 2018
Woodside Houses Playground Woodside Houses Seating Area Construction Completed November 2022
Yellowstone Park Queens General Site Work (QG-212M) Completed October 2016
Yellowstone Park Yellowstone Park Fencing Reconstruction Completed August 2023
Queens Street Tree Planting FY13 - Community Boards 7-9,11 (QG-113M) Completed March 2014

Staten Island Projects

Location Project Phase Completion Date
Alice Austen Park Alice Austen Park Buono Beach Paths and Rails Reconstruction Completed July 2016
Alice Austen Park Alice Austen Park McFarlane-Bredt House Reconstruction Completed December 2013
Alice Austen Park Buono Beach and Alice Austen Park Reconstruction (Hurricane Sandy) Completed June 2019
Alice Austen Park Buono Beach Fountain Reconstruction (Hurricane Sandy) Completed October 2023
Alice Austen Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Arden Woods Arden Woods Trail Construction Completed December 2022
Arden Woods Arden Woods Trailhead Parking Construction Completed November 2021
Arrochar Playground Arrochar Playground and Grandview Playground Public Restroom Building Reconstruction Completed February 2019
Arrochar Playground Arrochar Playground Pavement Reconstruction Completed November 2015
Arrochar Playground Arrochar Playground Reconstruction Completed March 2018
Austin J. McDonald Playground Austin J. McDonald Park Playground and Multi-Use Area Reconstruction (R034-115M) Completed May 2018
Austin J. McDonald Playground Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction Completed August 2020
Blood Root Valley Citywide Sandy-Related Recreational Lighting and Electrical Line Reconstruction Completed November 2013
Blood Root Valley Greenbelt Recreation Center Reconstruction Completed May 2024
Blood Root Valley Staten Island Greenbelt Recreation Center Parking Area Expansion Completed April 2019
Bloomingdale Park Bloomingdale Park Synthetic Turf Field Construction Completed November 2020
Bloomingdale Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Blue Heron Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Bobbie Lewis Jr. Playground Mariners Harbor Playground Reconstruction Completed November 2021
CPL. Thompson Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
CPL. Thompson Park Citywide Intermediate Pool Filter Plants Reconstruction Completed April 2023
CPL. Thompson Park Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
CPL. Thompson Park Corporal Thompson Park Synthetic Turf and Track Reconstruction Completed September 2023
CPL. Thompson Park Corporal Thompson Park West Brighton Pool Deck Reconstruction Completed April 2024
CPL. Thompson Park Staten Island General Site Work (RG-1013M) Completed December 2016
Christopher J. Igneri Playground Christopher J. Igneri Playground Reconstruction (RG-214MA) Completed September 2017
Clawson Playground Clawson Playground Reconstruction Phase I Completed October 2020
Clove Lakes Park Citywide Retaining Walls and Seawalls Reconstruction (CNYG-514M) Completed February 2020
Clove Lakes Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
Clove Lakes Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-415M) Completed July 2017
Clove Lakes Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Clove Lakes Park Clove Lakes 5K Running Trail Construction Completed January 2020
Clove Lakes Park Clove Lakes Park Fitness Equipment Reconstruction Completed August 2021
Clove Lakes Park Clove Lakes Park Parking Lot Reconstruction Completed February 2019
Clove Lakes Park Clove Lakes Park Pathways Reconstruction Phase 1 Completed September 2023
Clove Lakes Park Clove Lakes Park WWII Veterans War Memorial Ice Rink Condensers Reconstruction Completed October 2020
Clove Lakes Park Stonehenge Boiler and Heating Systems Reconstruction Completed June 2014
Conference House Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Conference House Park Conference House Beach Temporary Berm Reconstruction Completed August 2016
Conference House Park Conference House Park Beaches Emergency Protective Measures (Hurricane Sandy) Completed February 2015
Conference House Park Conference House Park Lenape Playground Reconstruction Completed December 2016
Conference House Park Conference House Park Path, Rail, and Landscape Reconstruction (Hurricane Sandy) Completed January 2019
Conference House Park Conference House Park Timber Barrier Rail Reconstruction Completed December 2016
Conference House Park Conference House Park Visitor Center Restrooms Reconstruction Completed November 2017
Conference House Park Conference House Pavilion Reconstruction Completed January 2020
Conference House Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Conference House Park Staten Island General Site Work (RG-713M) Completed March 2015
Conference House Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Staten Island South Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Crescent Beach Park Crescent Beach Park Barrier Berm Reconstruction Completed October 2016
Crescent Beach Park Crescent Beach Park Landscape Improvement and Pathway Construction Completed January 2020
De Matti Park Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction Completed August 2020
De Matti Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
De Matti Park DeMatti Park Reconstruction Completed March 2018
E.M.T. Christopher J. Prescott Playground Prescott Playground Reconstruction Completed June 2021
Faber Pool and Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Faber Pool and Park Citywide Plumbing Systems Reconstruction (CNYG-1711MA1) Completed June 2016
Faber Pool and Park Faber Park Active Recreation, Lighting and Seating Area Construction Completed November 2020
Faber Pool and Park Faber Park Safety Surfacing Reconstruction Completed May 2015
Faber Pool and Park Faber Park Skate Park Construction Completed January 2015
Faber Pool and Park Faber Pool and Lyons Pool Boiler Reconstruction Completed July 2018
Fairview Park Fairview Park Multi-Purpose Field and Landscape Construction Completed May 2021
Fairview Park Fairview Park Public Restroom Building Construction Completed June 2023
Fairview Park Fairview Park Reforestation Completed April 2021
Fairview Park Fairview Park Telecommunication Lines Reconstruction Completed June 2022
Franklin D. Roosevelt Boardwalk and Beach Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Franklin D. Roosevelt Boardwalk and Beach Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Franklin D. Roosevelt Boardwalk and Beach Staten Island General Site Work (RG-713M) Completed March 2015
Franklin D. Roosevelt Boardwalk and Beach Freedom Circle/Midland Beach Temporary Berm Reconstruction Completed October 2016
Franklin D. Roosevelt Boardwalk and Beach Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Franklin D. Roosevelt Boardwalk and Beach Midland Beach Landscape and Drainage Reconstruction Completed May 2019
Franklin D. Roosevelt Boardwalk and Beach Midland Beach Recreation Building Construction Completed October 2013
Franklin D. Roosevelt Boardwalk and Beach South Beach Playland Playground Curbs and Fencing Reconstruction Completed May 2015
Franklin D. Roosevelt Boardwalk and Beach Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Franklin D. Roosevelt Boardwalk and Beach Tappen Park and South Beach Fountain Reconstruction Completed May 2022
Freshkills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Freshkills Park Freshkills North Park Pathway and Public Restroom Building Construction Completed May 2022
Freshkills Park Freshkills Park Owl Hollow Fields Lawn Reconstruction Completed November 2016
Freshkills Park Freshkills Park Owl Hollow Fields Parking and Access Road Construction Completed June 2023
Freshkills Park Freshkills Park Zink House Roof Reconstruction Completed September 2017
Freshkills Park New Springville Greenway Construction Completed July 2015
Freshkills Park Owl Hollow Fields Construction Completed July 2013
Gen. Douglas MacArthur Park Citywide Pool Plumbing Systems Reconstruction (CNYG-915M) Completed June 2019
Gen. Douglas MacArthur Park Citywide Pool Structural Systems Reconstruction (CNYG-1015M) Completed June 2019
Gen. Douglas MacArthur Park MacArthur Park Multi-Purpose Ballfield and Basketball Court Reconstruction Completed May 2021
Gerard P. Dugan Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Gerard P. Dugan Playground Gerard P. Dugan Playground Reconstruction Completed January 2023
Gerard P. Dugan Playground Schmul Park and Dugan Playground Ballfield Reconstruction Completed June 2017
Graniteville Quarry Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Great Kills Park Staten Island Clean-Up and Safe-Up of Beaches and Parks (Hurricane Sandy) Completed July 2013
Great Kills Park Staten Island Building Demolition (Hurricane Sandy) Completed March 2016
Great Kills Park Staten Island General Site Work (RG-713M) Completed March 2015
Great Kills Park Midland Beach and Oakwood Beach Emergency Berm Installation Completed April 2014
Great Kills Park Staten Island Emergency Protective Measures (Hurricane Sandy) Completed December 2013
Great Kills Park Cedar Grove Beach Access Improvements Completed May 2015
Great Kills Park Cedar Grove Beach Freshwater Wetlands Reconstruction and Planting Completed January 2017
Great Kills Park New Dorp Beach Site Restoration in Great Kills Park (Hurricane Sandy) Completed February 2019
Great Kills Park New Dorp Beach Temporary Berm Reconstruction Completed June 2016
Great Kills Park New Dorp Center Interior Reconstruction (Hurricane Sandy) Completed August 2019
Greenbelt Native Plant Center Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Greenbelt Native Plant Center Greenbelt Native Plant Center Heating System Reconstruction Completed November 2016
Greencroft Playground Staten Island General Site Work (RG-1013M) Completed December 2016
Greencroft Playground Greencroft Playground Public Restroom Building Construction Completed October 2022
Harris Brothers Park Carlton Park Landscape and Ida Court Playground Reconstruction Completed September 2019
Heritage Park Heritage Park Operations Building Demolition (Hurricane Sandy) Completed October 2017
High Rock Park Citywide Energy Efficient Lighting Installation (CNYG-2415MA1) Completed October 2020
High Rock Park High Rock Park Altamont House Roof Reconstruction Completed June 2022
Ida Court Carlton Park Landscape and Ida Court Playground Reconstruction Completed September 2019
John E. White Park John E. White Park Playground Reconstruction Completed October 2022
LaTourette Park & Golf Course New Springville Greenway Construction Completed July 2015
Lemon Creek Park Staten Island General Site Work (RG-713M) Completed March 2015
Lemon Creek Park Lemon Creek Park Seguine Mansion Roof Reconstruction Completed November 2023
Lemon Creek Park Lemon Creek Park Timber Barrier Rail Reconstruction Completed August 2016
Levy Playground Levy Playground, McDonald Park and DeMatti Playground Public Restroom Building Reconstruction Completed August 2020
Levy Playground Levy Playground Reconstruction Completed May 2018
Long Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Lopez Playground Lopez Playground Modular Public Restroom Building Construction Completed March 2024
Lopez Playground Lopez Playground Reconstruction Completed May 2021
Lyons Pool Citywide Electrical Systems Reconstruction (CNYG-1611MA) Completed July 2017
Lyons Pool Citywide Olympic Pool Mechanical Systems Reconstruction Completed January 2024
Lyons Pool Citywide Pool Piping Hangers and Supports Reconstruction (CNYG-419M) Completed January 2021
Lyons Pool Faber Pool and Lyons Pool Boiler Reconstruction Completed July 2018
Lyons Pool Lyons Recreation Center Reconstruction Completed March 2024
Mahoney Playground Brooklyn and Staten Island General Roofing Systems Reconstruction (CNYG-1214MA) Completed February 2019
Mahoney Playground Mahoney Playground Rain Garden Reconstruction Completed April 2018
Mahoney Playground Mahoney Playground Synthetic Turf Field Reconstruction Completed November 2022
Midland Field Staten Island Basketball Court Reconstruction Completed July 2021
Naples Playground Naples Playground Reconstruction Completed May 2023
Ocean Breeze Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Ocean Breeze Park Ocean Breeze Park Maintenance Area Fencing Construction Completed August 2019
Old Town Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Old Town Playground Staten Island Basketball Court Reconstruction Completed July 2021
Prall Playground Prall Playground Public Restroom Building Reconstruction Completed September 2024
Rev. Dr. Maggie Howard Playground Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Rev. Dr. Maggie Howard Playground Rev. Dr. Maggie Howard Playground Reconstruction Completed April 2021
Richmond Terrace Park Richmond Terrace Park Construction Completed November 2019
Schmul Park Schmul Park and Dugan Playground Ballfield Reconstruction Completed June 2017
Seaside Wildlife Nature Park Nelson Avenue Waterfront Park Reconstruction (Hurricane Sandy) Completed March 2019
Silver Lake Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Silver Lake Park Brooklyn and Staten Island Roofing Systems Reconstruction (CNYG-3109M) Completed June 2014
Silver Lake Park Staten Island General Site Work (RG-713M) Completed March 2015
Silver Lake Park Silver Lake Park Path Reconstruction Completed February 2019
Silver Lake Park Silver Lake Park Pathway Reconstruction Completed March 2024
Silver Lake Park Silver Lake Park Pavement Reconstruction Completed September 2021
Skyline Playground Skyline Playground Tennis Courts Reconstruction Completed July 2017
Staten Island Industrial Park Citywide Electrical Systems Reconstruction (CNYG-309M) Completed January 2014
Tappen Park Tappen Park and South Beach Fountain Reconstruction Completed May 2022
The Big Park Arrochar Playground and Grandview Playground Public Restroom Building Reconstruction Completed February 2019
The Big Park Grandview Playground Reconstruction Completed June 2018
Tottenville Pool Citywide Pool Electrical Systems Reconstruction (CNYG-815MA) Completed June 2019
Various locations Staten Island Street Tree Planting FY23 - Community Board 1-3 Completed April 2024
Various locations in Staten Island Staten Island Park Tree Planting FY21 (RG-221M) Completed January 2022
Various locations in Staten Island Staten Island Park Tree Planting FY21 (RG-519M) Completed November 2023
Various locations in Staten Island Staten Island Reforestation FY19 Completed May 2024
Various locations in Staten Island Staten Island Reforestation FY20 Completed November 2023
Various locations in Staten Island Staten Island Street Tree Planting FY13 (RG-111MR) Completed June 2014
Various locations in Staten Island Staten Island Street Tree Planting FY17 Completed June 2018
Various locations in Staten Island Staten Island Street Tree Planting FY18 Completed March 2020
Various locations in Staten Island Staten Island Street Tree Planting FY21 (RG-121M) Completed June 2022
Various locations in Staten Island Staten Island Street Tree Planting FY21 (RG-619M) Completed April 2023
Various locations in Staten Island Staten Island Tree-Damaged Sidewalk Reconstruction FY19 Completed February 2021
Various locations in Staten Island Staten Island Tree-Damaged Sidewalk Reconstruction FY21 Completed March 2023
Various locations, Staten Island Staten Island Sandy-Related Tree Removal Completed September 2015
Various locations, Staten Island Staten Island Sandy-Related Tree Replacement Completed June 2016
Various locations, Staten Island Staten Island Street Tree Planting FY14 Completed March 2015
Various locations, Staten Island Staten Island Street Tree Planting FY16 Completed June 2017
Walker Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Westerleigh Park Westerleigh Park Rain Garden Construction Completed September 2016
Willowbrook Park Willowbrook Park Public Restroom Building Roof Reconstruction Completed November 2022
Wolfe's Pond Park Citywide Guide Rail and Fencing Reconstruction (CNYG-1009MA1) Completed June 2015
Wolfe's Pond Park Staten Island General Site Work (RG-315MA1) Completed September 2020
Wolfe's Pond Park Staten Island General Site Work (RG-1013M) Completed December 2016
Wolfe's Pond Park Staten Island Basketball Court Reconstruction Completed July 2021
Wolfe's Pond Park Wolfe's Pond Park Landscape Reconstruction Completed October 2019
Wolfe's Pond Park Wolfe's Pond Park Playground Reconstruction (Hurricane Sandy) Completed May 2018
Staten Island Street Tree Planting FY15 Completed May 2016

Citywide Projects

Project Phase Completion Date
Citywide Recreation & Nature Centers Electrical System Reconstruction Completed March 2014
Citywide Reforestation FY18 Completed September 2019
Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA) Completed September 2024
Citywide Tree Guard Installation FY21 Completed August 2023
Brooklyn and Queens Reforestation FY17 Completed April 2019
Queens Community Boards 1-7 and Brooklyn Reforestation FY20 Completed December 2022
Brooklyn and Staten Island Emerald Ash Borer (EAB) Related Tree Removal Completed March 2023
Brooklyn and Staten Island Street Tree Planting FY10 Completed December 2013
Brooklyn, Queens and Staten Island Reforestation FY18 Completed June 2021
Manhattan and Bronx Street Tree Planting FY22 Completed January 2024
Bronx and Manhattan Emerald Ash Borer (EAB) Related Tree Removal Completed March 2023
Bronx and Manhattan Tree-Damaged Sidewalk Reconstruction FY19 Completed February 2021
Bronx and Queens Reforestation FY16 Completed January 2019
Queens Community Boards 8-14 and Bronx Reforestation FY20 Completed November 2023
Bronx and Queens Reforestation FY10 Completed May 2015
Bronx, Manhattan and Queens Park Trees Planting and Replacement Completed April 2021
Bronx, Manhattan and Queens Reforestation FY18 Completed May 2021
Bronx, Manhattan and Queens Sandy-Related and Risk Management Tree Removal FY19 Completed September 2019
Bronx, Manhattan and Queens Sandy-Related Risk Management and Tree Removal Completed September 2018
Bronx, Manhattan and Queens Sandy-Related Park Tree Planting and Replacement FY18 Completed April 2021
Brooklyn and Staten Island Reforestation FY14 Completed November 2016
Brooklyn and Staten Island Sandy-Related and Risk Management Tree Removal Completed September 2018
Brooklyn and Staten Island Sidewalk Reconstruction FY13 Completed January 2016
Brooklyn, Queens, and Staten Island Sidewalk Reconstruction FY12 Completed October 2013
Brooklyn and Queens Reforestation FY13 Completed June 2016
Brooklyn and Queens Reforestation FY14 Completed September 2016
Queens and Staten Island Reforestation FY12 Completed November 2015
Citywide Green Infrastructure Construction FY13 Completed December 2015
Yankee Stadium-Related Street Tree Planting (CNYG-414M) Completed July 2016
Bronx and Queens Reforestation FY13 Completed April 2016
Bronx, Brooklyn, and Queens Sidewalk Reconstruction FY13 Completed January 2015
Brooklyn and Staten Island Reforestation FY15 Completed June 2018