Capital Project Tracker

Rendering of Lakeside Center

In order to invest in the care of our parks, we must regularly redesign and rebuild our city’s parks and facilities. There are several hundred active projects taking place at any time in parks throughout the city, ranging from improvements to parks, playgrounds, and greenways, to renovations of ball fields and recreational facilities, to resiliency efforts for beaches and boardwalks. Learn more about projects taking place near you, and find out the current status of a project.

How We Build Parks

Visit our How We Build Parks page to learn more about the three main phases of the city’s capital process and how a project becomes eligible for capital funding.

View Active ProjectsView Proposed ProjectsView Partner ProjectsView Completed Projects

Completed Projects (1,314) View only projects nearing completion

Bronx Projects

Completion Date Location Project
April 2019 Nelson Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M)
April 2019 Rev J Polite Playground Bronx and Queens Roofing Systems Reconstruction (CNYG-1114M)
April 2019 FDNY-EMT Yadira Arroyo Playground Black Rock Playground Reconstruction
March 2019 Agnes Haywood Playground Agnes Haywood Playground Reconstruction
March 2019 People's Park Citywide Electrical Systems Reconstruction (CNYG-914M)
March 2019 Walter Gladwin Park Citywide Electrical Systems Reconstruction (CNYG-914M)
March 2019 People's Park Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M)
March 2019 Walter Gladwin Park Citywide Public Restroom Building and Facility Plumbing & HVAC Reconstruction (CNYG-1014M)
March 2019 Pelham Bay Park Pelham Bay Park Service Building Gas Line Construction and Heating System Reconstruction
February 2019 Walton Park Walton Park Reconstruction
February 2019 Van Nest Park Van Nest Flag Pole and Plaza Construction
January 2019 Various locations in the Bronx. Bronx Street Tree Planting FY19 - Community Boards 1-8
December 2018 Macombs Dam Park Bronx General Site Work (XG-415M)
December 2018 Pelham Bay Park Bronx General Site Work (XG-415M)
December 2018 Riverbend Playground Bronx General Site Work (XG-415M)
December 2018 St. James Park Bronx General Site Work (XG-415M)
December 2018 Mount Hope Garden Mt. Hope Garden Play Area Reconstruction
December 2018 Ogden Plimpton Playground Ogden Plimpton Playground Reconstruction
December 2018 Little Claremont Playground Little Claremont Playground Reconstruction
December 2018 Devoe Park Devoe Park Perimeter Steel Gates Installation
December 2018 Nelson Playground Nelson Playground Basketball Court and Bleachers Reconstruction
December 2018 St. Mary's Park St. Mary's Recreation Center Pool and Gymnasium HVAC Reconstruction
October 2018 Al Quiñones Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction
October 2018 Hunts Point Playground Hunts Point, Playground 52, Carmansville, MLK, and Sol Lain Playgrounds Public Restroom Building Reconstruction
October 2018 Bronx Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA)
October 2018 Crotona Park Bronx and Queens Roofing Systems Reconstruction (CNYG-315MA)
September 2018 Longfellow Playground Longfellow Gardens Reconstruction
July 2018 Pelham Bay Park Orchard Beach Nature Center Roof Reconstruction
July 2018 Al Quiñones Playground Kelly Playground Skate Park Reconstruction
July 2018 Bronx River Parkway Shoelace Park Green Infrastructure Construction Phase 1
June 2018 Various locations in the Bronx Bronx Street Tree Planting FY17 - Community Boards 9-12
June 2018 Millbrook Playground Millbrook Playground Basketball and Handball Court Reconstruction
June 2018 Various locations in the Bronx Bronx Street Tree Planting FY17 - Community Boards 1-8
June 2018 Whalen Playground Whalen Playground Reconstruction
June 2018 Van Cortlandt Park Van Cortlandt Park Dog Run Construction
April 2018 Tiffany Street Pier Tiffany Street Pier Reconstruction (Hurricane Sandy)
April 2018 Van Cortlandt Park Citywide Pool Plumbing Systems Reconstruction (CNYG-714M)
March 2018 Rev. T. Wendell Foster Park and Recreation Center Mullaly Recreation Center Door Replacement
March 2018 Al Quiñones Playground Playground 52 Reconstruction
March 2018 Ferry Point Park Ferry Point Park West Public Restroom Building Construction
March 2018 Ferry Point Park Ferry Point Park West Public Restroom Building Construction - Electrical
March 2018 Ferry Point Park Ferry Point Park West Public Restroom Building Construction - HVAC
March 2018 Ferry Point Park Ferry Point Park West Public Restroom Building Construction - Plumbing
March 2018 Joyce Kilmer Park Joyce Kilmer Park Perimeter Fence Construction
February 2018 Harris Park Harris Park Reconstruction
December 2017 Lyons Square Playground Lyons Square Playground Reconstruction
December 2017 Bicentennial Veterans Memorial Park Bronx General Site Work (XG-315M)
December 2017 Bufano Park Bronx General Site Work (XG-315M)
December 2017 Pelham Bay Park Bronx General Site Work (XG-315M)
December 2017 Vidalia Park Bronx General Site Work (XG-315M)

Brooklyn Projects

Completion Date Location Project
January 2025 Various locations Brooklyn Street Tree Planting FY24 - Community Boards 3 & 4
December 2024 Sankofa Park Sankofa Park Reconstruction
November 2024 Highland Park Childrens Garden Highland Park Community Garden Water Service Installation
November 2024 Shore Park and Parkway Shore Park and Parkway Vinland Playground Reconstruction
November 2024 Walt Whitman Park Walt Whitman Park Sewer Reconstruction
November 2024 Ocean Parkway Malls Ocean Parkway Malls Bike Path Reconstruction
October 2024 Canarsie Park Canarsie Park Public Restroom Building Construction
October 2024 Marine Park Marine Park Oval Path Reconstruction
September 2024 Washington Skate Park Washington Park Dog Run Reconstruction
September 2024 Cooper Park Cooper Park Public Restroom Building Reconstruction
August 2024 Frost Playground Frost Playground Basketball Courts Reconstruction
August 2024 Kelly Park Playground Kelly Park Playground Reconstruction
August 2024 Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 6, 7, 10
August 2024 Various locations in Brooklyn Brooklyn Street Tree Planting FY21 - Community Boards 8, 9, 17, 18
July 2024 Kelly Park Playground Kelly Park Public Restroom Building Reconstruction
July 2024 Sarah J.S. Tompkins Garnet Playground Sarah J.S. Tompkins Garnet Playground Basketball Courts Reconstruction
June 2024 McCarren Park McCarren Park Bathhouse Roof & Exterior Walls Reconstruction
June 2024 Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 11, 13, 15
June 2024 Dimattina Playground Dimattina Playground Ballfield Lighting Reconstruction
June 2024 Dyker Beach Park Dyker Beach Park Ballfield Lighting Reconstruction
May 2024 Parade Ground Parade Ground Parks Enforcement Facility Windows, Storefront and HVAC Reconstruction
April 2024 Cadman Plaza Park Cadman Plaza Park Oval Reconstruction
April 2024 Coney Island Beach & Boardwalk Coney Island Boardwalk Security Measures Construction
April 2024 Park Ocean Parkway Sitting Areas Reconstruction
April 2024 Park Ocean Parkway Sitting Areas Reconstruction
April 2024 Fidler-Wyckoff House Park Wyckoff House Park Public Restroom Building Construction
March 2024 Epiphany Playground Epiphany Playground Reconstruction
March 2024 Various locations in Brooklyn Brooklyn PLANYC Street Tree Planting - FY22 Community Boards 5, 16
February 2024 Washington Hall Park Washington Hall Playground Basketball Courts Reconstruction
February 2024 Various locations in Brooklyn Brooklyn Street Tree Planting FY22 - Community Boards 2-3
January 2024 John J Carty Park John J. Carty Park Playground Reconstruction
January 2024 Betsy Head Park Citywide Olympic Pool Mechanical Systems Reconstruction
January 2024 Linden Park Linden Park Playground Reconstruction
January 2024 Potomac Playground Brooklyn Basketball Courts Reconstruction
January 2024 Star Spangled Playground Brooklyn Basketball Courts Reconstruction
January 2024 Taaffe Playground Brooklyn Basketball Courts Reconstruction
January 2024 Harold Ickes Playground Harold Ickes Playground BMX Bike & Skate Park and Multipurpose Play Area Construction
December 2023 Ocean Hill Playground Ocean Hill Playground Reconstruction
December 2023 Brownsville Playground Brownsville Playground Ballfield Lighting Reconstruction
November 2023 Dyker Beach Park Brooklyn Multipurpose Play Areas Reconstruction
November 2023 Patrick O'Rourke Playground Brooklyn Multipurpose Play Areas Reconstruction
November 2023 Wilson Playground Brooklyn Multipurpose Play Areas Reconstruction
November 2023 Various locations in Brooklyn Brooklyn Park Tree Planting FY21 (BG-1119M)
October 2023 Marine Park Marine Park Golf Course Path Reconstruction
October 2023 Commodore Barry Park Commodore Barry Park Public Restroom Building Reconstruction
October 2023 Various locations Brooklyn Street Tree Planting FY23 - Community Boards 12 &14 (BG-1619MR)
October 2023 Rainbow Playground Rainbow Playground Reconstruction
September 2023 Park Gateway Estates Phase II Park Construction
September 2023 P.S. 125 Playground P.S. 125 Playground Reconstruction
September 2023 Calvert Vaux Park Calvert Vaux Park Ballfield Lighting Reconstruction

Manhattan Projects

Completion Date Location Project
December 2024 Randall's Island Park Citywide Services Complex and Garage Gas Line Reconstruction
December 2024 Various locations Manhattan Park Tree Planting FY22
December 2024 Sheltering Arms Playground Sheltering Arms Playground Public Restroom Building Reconstruction
December 2024 East 66th Street between 2nd Avenue and 3rd Avenue East 66th Street Greenstreets Reconstruction
November 2024 Bennett Park Bennett Park Central Lawn Reconstruction
October 2024 Vincent F. Albano Jr. Playground Albano Playground Reconstruction
October 2024 Various locations in Manhattan Manhattan Street Tree Planting FY21 - Community Boards 3, 6
October 2024 Peter Detmold Park Peter Detmold Park Water Service Reconstruction
August 2024 Matthew P. Sapolin Playground Matthew P. Sapolin Playground Sewer Service Reconstruction
August 2024 Sol Bloom Playground Sol Bloom Playground Basketball Court Reconstruction
August 2024 6BC Botanical Garden 6BC Botanical Garden Water Service Installation
July 2024 Highbridge Park Highbridge Park Dyckman Rest Reconstruction
June 2024 Alfred E. Smith Playground Alfred E. Smith Park Recreation Center Gymnasium Lights Reconstruction
June 2024 Various locations in Manhattan Manhattan Street Tree Planting FY22 - Council District 5
June 2024 John Jay Park John Jay Park Ramp Construction
June 2024 Matthew P. Sapolin Playground Matthew P. Sapolin Playground Multipurpose Play Area Reconstruction
May 2024 John Jay Park John Jay Park Pool Deck Reconstruction
April 2024 Sheltering Arms Playground Sheltering Arms Pool Deck Reconstruction
March 2024 Sara D. Roosevelt Park Sara D. Roosevelt Park BRC Senior Center Windows and HVAC Reconstruction
March 2024 Corlears Hook Park Corlears Hook Park Synthetic Turf Field Reconstruction
February 2024 Highbridge Park Highbridge Park Public Restroom Building Construction
February 2024 Various locations in Manhattan Manhattan Lower East Side Street Tree Planting and Community Greening FY22
January 2024 Highbridge Park Citywide Olympic Pool Mechanical Systems Reconstruction
January 2024 Jackie Robinson Park Citywide Olympic Pool Mechanical Systems Reconstruction
January 2024 P.S. 155 Playground P.S. 155 Playground Reconstruction
January 2024 Frederick Johnson Playground Frederick Johnson Playground Public Restroom Building Construction
December 2023 St. Nicholas Park St. Nicholas Park Paths Reconstruction
December 2023 Alfred E. Smith Playground Alfred E. Smith Recreation Center Fitness Room Reconstruction
November 2023 Carl Schurz Park Carl Schurz Park Security Measures Construction
November 2023 Tompkins Square Park Tompkins Square Park Multipurpose Play Area Reconstruction
October 2023 Riverside Park Riverside Park 105th Street Paths Reconstruction
October 2023 Riverside Park Riverside Park 148th Street Paths Reconstruction
October 2023 Annunciation Playground Annunciation Playground Synthetic Turf and Track Reconstruction
October 2023 William F. Passannante Ballfield William F. Passannante Ballfield Reconstruction
October 2023 Randall's Island Park Randall's Island Park Citywide Services Complex Fleet Shop Exhaust System Reconstruction
September 2023 Chelsea Recreation Center Chelsea Recreation Center Storefront Entry System Reconstruction
September 2023 Chelsea Park Chelsea Park Synthetic Turf and Track Reconstruction
September 2023 Inwood Hill Park Inwood Hill Nature Center Post-Sandy Reconstruction
August 2023 Marcus Garvey Park Marcus Garvey Park POP Office Roof Reconstruction
August 2023 Hell's Kitchen Park Hell's Kitchen Park Pavement Reconstruction
August 2023 Mary O'Connor Playground Mary O'Connor and Tudor Grove Playground Reconstruction
August 2023 Tudor Grove Playground Mary O'Connor and Tudor Grove Playground Reconstruction
July 2023 Vietnam Veterans Plaza Vietnam Veterans Plaza Reconstruction (Hurricane Sandy)
July 2023 Monsignor Kett Playground Monsignor Kett Playground Reconstruction
June 2023 Hamilton Fish Park Hamilton Fish Park Pool Filter Plant Façade Stabilization
June 2023 Chelsea Park Chelsea Park Basketball Court Reconstruction
June 2023 Jacob H. Schiff Playground Jacob Schiff Playground Sitting Area Reconstruction
June 2023 Asser Levy Playground Asser Levy Recreation Center Fitness Room Reconstruction
June 2023 Riverside Park Riverside Park 102nd Street Staircase Reconstruction
June 2023 Bellevue South Park Bellevue South Park Reconstruction

Queens Projects

Completion Date Location Project
December 2024 Kissena Park Kissena Park Green Infrastructure Construction
December 2024 Highland Park Highland Park Path Reconstruction
November 2024 Rockaway Beach Boardwalk Shore Front Parkway Amenities Construction
October 2024 Various locations in Queens Queens Street Tree Planting FY21 - Community Boards 8, 11-13
September 2024 Ralph Demarco Park Ralph Demarco Park Shoreline Reconstruction (Hurricane Sandy)
September 2024 Electric Playground Queens Green Infrastructure Construction (QG-518M)
September 2024 Helen Marshall Playground Queens Green Infrastructure Construction (QG-518M)
September 2024 Horace Harding Playground Queens Green Infrastructure Construction (QG-518M)
September 2024 London Planetree Playground Queens Green Infrastructure Construction (QG-518M)
September 2024 Tudor Park Queens Green Infrastructure Construction (QG-518M)
September 2024 Flushing Meadows Corona Park Flushing Meadows Corona Park Synthetic Turf Fields 8 & 9 Reconstruction
September 2024 Various locations Queens Street Tree Planting FY23 - Community Board 7
September 2024 Cunningham Park Cunningham Park 210th Street Playground Reconstruction
September 2024 Harold Schneiderman Playground Harold Schneiderman Playground Reconstruction
August 2024 Alley Pond Park Alley Pond Park Parking Lot Reconstruction
July 2024 Sohncke Square Sohncke Square Reconstruction
June 2024 James A. Bland Playground James A. Bland Playground Reconstruction
June 2024 St. Michael's Playground St. Michael's Playground Synthetic Turf Field Reconstruction
June 2024 Astoria Park Astoria Pool Filtration System Reconstruction
June 2024 Captain Tilly Park Captain Tilly Park Public Restroom Building Reconstruction
June 2024 Various locations in Queens Queens Park Tree Planting FY22
May 2024 College Point Fields College Point Fields Sports and Security Lighting Construction
May 2024 Idlewild Park Idlewild Park Fencing, Sidewalks and Parking Lot Reconstruction
May 2024 Dutch Kills Playground Dutch Kills Playground Ballfield Lighting Reconstruction
May 2024 Flushing Meadows Corona Park Flushing Meadows Corona Park Meadow Lake Northwest Area Reconstruction
May 2024 Highland Park Highland Park Ridgewood Reservoir Gatehouse 27 Reconstruction
April 2024 Hermon A. MacNeil Park MacNeil Park Entrances Reconstruction
April 2024 Socrates Sculpture Park Socrates Sculpture Park Administration Building Construction
April 2024 Bellerose Playground Bellerose Playground Reading Garden Construction
March 2024 L/CPL Thomas P. Noonan Jr. Playground Noonan Playground Dog Run Construction and Seating Area Reconstruction
March 2024 Bayside Playground Bayside Playground Public Restroom Building Reconstruction
February 2024 Rockaway Beach and Boardwalk Beach 24th and 25th Streets Ramps Construction
February 2024 Various locations in Queens Queens Street Tree Planting FY22 - Community Boards 9-10, 14
December 2023 Mafera Park Mafera Park Ballfield Lighting Reconstruction
December 2023 Maurice A FitzGerald Playground Maurice A. Fitzgerald Playground Ballfield Lighting Reconstruction
December 2023 St. Michael's Playground St. Michael's Playground Ballfield Lighting Reconstruction
December 2023 Cunningham Park Cunningham Park Lower Redwood Playground Spray Shower Area Reconstruction
November 2023 Gorman Playground Gorman Playground Reconstruction
November 2023 Rockaway Beach Boardwalk Shore Front Parkway Beach 98th Playground Construction
November 2023 Various locations, Queens West Queens Tree-Damaged Sidewalk Reconstruction Community Boards 1-6,9,10 (QG-1223MR)
October 2023 Hallets Cove Playground Hallets Cove Playground Handball Court Reconstruction
October 2023 Detective Keith L Williams Park Detective Keith L. Williams Park Basketball Courts Reconstruction
October 2023 Cunningham Park Cunningham Park Redwood Upper Playground Reconstruction
October 2023 Raymond O’Connor Park Kennedy Playground Raymond O'Connor Field Synthetic Turf Reconstruction
September 2023 Nameoke Park Nameoke Park Construction
September 2023 Park at Beach 108 Street Beach 108th Street Esplanade Reconstruction
September 2023 Maple Playground Maple Playground Reconstruction
September 2023 Alley Pond Park Alley Pond Environmental Center Reconstruction
August 2023 Yellowstone Park Yellowstone Park Fencing Reconstruction
August 2023 Big Bush Playground Big Bush Playground Synthetic Turf Field Reconstruction

Staten Island Projects

Completion Date Location Project
November 2024 Blood Root Valley Greenbelt Recreation Center Synthetic Turf Field Reconstruction
September 2024 Prall Playground Prall Playground Public Restroom Building Reconstruction
May 2024 Hero Park Hero Park Path Reconstruction
May 2024 Blood Root Valley Greenbelt Recreation Center Reconstruction
May 2024 Various locations in Staten Island Staten Island Reforestation FY19
April 2024 Various locations Staten Island Street Tree Planting FY23 - Community Board 1-3
April 2024 CPL. Thompson Park Corporal Thompson Park West Brighton Pool Deck Reconstruction
March 2024 Lyons Pool Lyons Recreation Center Reconstruction
March 2024 Silver Lake Park Silver Lake Park Pathway Reconstruction
March 2024 Lopez Playground Lopez Playground Modular Public Restroom Building Construction
January 2024 Lyons Pool Citywide Olympic Pool Mechanical Systems Reconstruction
November 2023 Various locations in Staten Island Staten Island Reforestation FY20
November 2023 Various locations in Staten Island Staten Island Park Tree Planting FY21 (RG-519M)
November 2023 Lemon Creek Park Lemon Creek Park Seguine Mansion Roof Reconstruction
October 2023 Alice Austen Park Buono Beach Fountain Reconstruction (Hurricane Sandy)
September 2023 Clove Lakes Park Clove Lakes Park Pathways Reconstruction Phase 1
September 2023 CPL. Thompson Park Corporal Thompson Park Synthetic Turf and Track Reconstruction
June 2023 Fairview Park Fairview Park Public Restroom Building Construction
June 2023 Freshkills Park Freshkills Park Owl Hollow Fields Parking and Access Road Construction
May 2023 Naples Playground Naples Playground Reconstruction
April 2023 Various locations in Staten Island Staten Island Street Tree Planting FY21 (RG-619M)
April 2023 CPL. Thompson Park Citywide Intermediate Pool Filter Plants Reconstruction
March 2023 Various locations in Staten Island Staten Island Tree-Damaged Sidewalk Reconstruction FY21
January 2023 Gerard P. Dugan Playground Gerard P. Dugan Playground Reconstruction
December 2022 Arden Woods Arden Woods Trail Construction
November 2022 Willowbrook Park Willowbrook Park Public Restroom Building Roof Reconstruction
November 2022 Mahoney Playground Mahoney Playground Synthetic Turf Field Reconstruction
October 2022 Greencroft Playground Greencroft Playground Public Restroom Building Construction
October 2022 John E. White Park John E. White Park Playground Reconstruction
June 2022 Fairview Park Fairview Park Telecommunication Lines Reconstruction
June 2022 High Rock Park High Rock Park Altamont House Roof Reconstruction
June 2022 Various locations in Staten Island Staten Island Street Tree Planting FY21 (RG-121M)
May 2022 Freshkills Park Freshkills North Park Pathway and Public Restroom Building Construction
May 2022 Franklin D. Roosevelt Boardwalk and Beach Tappen Park and South Beach Fountain Reconstruction
May 2022 Tappen Park Tappen Park and South Beach Fountain Reconstruction
January 2022 Various locations in Staten Island Staten Island Park Tree Planting FY21 (RG-221M)
November 2021 Bobbie Lewis Jr. Playground Mariners Harbor Playground Reconstruction
November 2021 Arden Woods Arden Woods Trailhead Parking Construction
September 2021 Silver Lake Park Silver Lake Park Pavement Reconstruction
August 2021 Clove Lakes Park Clove Lakes Park Fitness Equipment Reconstruction
July 2021 Midland Field Staten Island Basketball Court Reconstruction
July 2021 Old Town Playground Staten Island Basketball Court Reconstruction
July 2021 Wolfe's Pond Park Staten Island Basketball Court Reconstruction
June 2021 E.M.T. Christopher J. Prescott Playground Prescott Playground Reconstruction
May 2021 Gen. Douglas MacArthur Park MacArthur Park Multi-Purpose Ballfield and Basketball Court Reconstruction
May 2021 Lopez Playground Lopez Playground Reconstruction
May 2021 Fairview Park Fairview Park Multi-Purpose Field and Landscape Construction
April 2021 Fairview Park Fairview Park Reforestation
April 2021 Rev. Dr. Maggie Howard Playground Rev. Dr. Maggie Howard Playground Reconstruction
February 2021 Various locations in Staten Island Staten Island Tree-Damaged Sidewalk Reconstruction FY19

Citywide Projects

Completion Date Project
September 2024 Citywide Synthetic Turf Field Reconstruction (CNYG-1119MA)
January 2024 Manhattan and Bronx Street Tree Planting FY22
November 2023 Queens Community Boards 8-14 and Bronx Reforestation FY20
August 2023 Citywide Tree Guard Installation FY21
March 2023 Brooklyn and Staten Island Emerald Ash Borer (EAB) Related Tree Removal
March 2023 Bronx and Manhattan Emerald Ash Borer (EAB) Related Tree Removal
December 2022 Queens Community Boards 1-7 and Brooklyn Reforestation FY20
June 2021 Brooklyn, Queens and Staten Island Reforestation FY18
May 2021 Bronx, Manhattan and Queens Reforestation FY18
April 2021 Bronx, Manhattan and Queens Park Trees Planting and Replacement
April 2021 Bronx, Manhattan and Queens Sandy-Related Park Tree Planting and Replacement FY18
February 2021 Bronx and Manhattan Tree-Damaged Sidewalk Reconstruction FY19
September 2019 Citywide Reforestation FY18
September 2019 Bronx, Manhattan and Queens Sandy-Related and Risk Management Tree Removal FY19
April 2019 Brooklyn and Queens Reforestation FY17
January 2019 Bronx and Queens Reforestation FY16
September 2018 Bronx, Manhattan and Queens Sandy-Related Risk Management and Tree Removal
September 2018 Brooklyn and Staten Island Sandy-Related and Risk Management Tree Removal
June 2018 Brooklyn and Staten Island Reforestation FY15
November 2016 Brooklyn and Staten Island Reforestation FY14
September 2016 Brooklyn and Queens Reforestation FY14
July 2016 Yankee Stadium-Related Street Tree Planting (CNYG-414M)
June 2016 Brooklyn and Queens Reforestation FY13
April 2016 Bronx and Queens Reforestation FY13
January 2016 Brooklyn and Staten Island Sidewalk Reconstruction FY13
December 2015 Citywide Green Infrastructure Construction FY13
November 2015 Queens and Staten Island Reforestation FY12
May 2015 Bronx and Queens Reforestation FY10
January 2015 Bronx, Brooklyn, and Queens Sidewalk Reconstruction FY13
March 2014 Citywide Recreation & Nature Centers Electrical System Reconstruction
December 2013 Brooklyn and Staten Island Street Tree Planting FY10
October 2013 Brooklyn, Queens, and Staten Island Sidewalk Reconstruction FY12