Riverside Park
NYC PARKS TO TEMPORARILY CLOSE RIVERSIDE PARK CHERRY WALK—MANHATTAN
NYC PARKS TO TEMPORARILY CLOSE RIVERSIDE PARK CHERRY WALK—MANHATTANFriday, September 18, 2020
No. 38
http://www.nyc.gov/parks
Planned reconstruction of path requires greenway detour
Out of an abundance of caution, and due to planned shoreline and path reconstruction work, NYC Parks has announced that it will temporarily close the Cherry Walk path in Riverside Park from W. 100th to W. 125th streets. The closure will begin Monday, September 28.
To accommodate pedestrians and cyclists, Parks will post signs at related path entrances, south and north of the greenway, notifying them of the detour path. Visitors will be directed to exit the greenway at 100th St. to access alternative paths and local streets. Cyclists may re-enter the greenway at West 153rd Street and Riverside Drive via the Herman “Denny” Farrell Pedestrian Bridge. Pedestrians may re-enter via steps at Tiemann Place that connect Riverside Drive to St. Clair Place.
The Cherry Walk is slated for necessary safety and infrastructure work as part of a $1.5 million FEMA-funded reconstruction to address damage caused by Superstorm Sandy in Riverside and Fort Washington parks. The project will restore the vulnerable shoreline and repave the path, providing a safer and smoother biking experience.
The Cherry Walk will be temporarily closed until further notice.
Check out your park's Vital Signs
Clean & Safe
Green & Resilient
Empowered & Engaged Users
Share your feedback or learn more about how this park is part of a Vital Park System
Know Before You Go
Due to construction, as of September 23, 2024, Cherry Walk at Riverside Park is temporarily closed between West 100th Street and St. Clair Place (West 125th St). Please view our Temporary Greenway Detour map for an alternative route.
Anticipated Completion: Spring 2025
Related inquiries may be sent to boatbasin@parks.nyc.gov
Related inquiries may be sent to boatbasin@parks.nyc.gov