Riverside Park

Tot Lot One Hundred And Ten

W 110-111 Sts, Riverside Dr
Last 10 Inspections
Overall Condition AcceptableCleanliness Acceptable
10 of 1010 of 10
Inspection DateOverall ConditionCleanlinessUnacceptable Features
8/15/2024AcceptableAcceptable
  • Litter
4/2/2024AcceptableAcceptable
    10/17/2023AcceptableAcceptable
      5/11/2023AcceptableAcceptable
        12/19/2022AcceptableAcceptable
          8/10/2022AcceptableAcceptable
          • Litter
          3/21/2022AcceptableAcceptable
            10/14/2021AcceptableAcceptable
            • Fences
            • Litter
            5/5/2021AcceptableAcceptable
              11/30/2020AcceptableAcceptable

                Check out your park's Vital Signs

                Clean & Safe

                Green & Resilient

                Empowered & Engaged Users

                Share your feedback or learn more about how this park is part of a Vital Park System

                Park Information

                Know Before You Go

                Park
                Riverside Park

                Due to construction, as of September 23, 2024, Cherry Walk at Riverside Park is temporarily closed between West 100th Street and St. Clair Place (West 125th St). Please view our Temporary Greenway Detour map for an alternative route.


                Anticipated Completion: Spring 2025
                Marinas
                West 79th Street Boat Basin
                The 79th Street Boat Basin is closed and is anticipated to reopen in 2028.

                Related inquiries may be sent to boatbasin@parks.nyc.gov
                Kayak/Canoe Launch Sites
                Riverside Park (79th Street)
                The 79th Street Boat Basin marina is currently closed. No vessel dockage, moorage, anchorage or launch services are available. The marina will be dredged and reconstructed to modern codes and standards. The marina is anticipated to reopen in 2028.

                Related inquiries may be sent to boatbasin@parks.nyc.gov